Site work for a mixed-use development in Hartford, Connecticut. Working plans call for site work for a playground / park / athletic field.

The work of this contract includes, but is not limited to the following: 1) Removal and storage of existing playscape and structures for reinstallation (by Preferred Vendor); 2) Removal of existing playscape surface and bituminous concrete sub-surface to concrete deck; 3) Repair of existing concrete deck and drainage system as required per review with Engineer; 4) Inspection, testing and repairs to existing trench drain as required per review with Engineer; 5) Reinstallation of playscape structures to concrete deck (by Preferred Vendor); 6) Installation of waterproof membrane, lightweight concrete, and second waterproof membrane 7) Installation of playscape surfacing (by Preferred Vendor); 8) The Contractor will include in their bid, all items required in order to carry out the intent of the Work as described, shown and implied in the Contract Documents. 9) The Work will be constructed under the Contractor's Contract as applicable to this Project. As security, each bid must be accompanied by a Certified Check payable to the Treasurer of the State of Connecticut, OR the bid must be accompanied by a Bid Bond, AIA Form A-310, having as surety thereto such Surety Company or Companies as are authorized to do business in this State for an amount not less than 10% of the Bid. The awarding authority reserves the right to waive technical defects or to reject any and all bids. Performance and Payments Bonds shall be furnished by the successful bidder awarded the contract in an amount of 100% of the Contract Sum. Prevailing wage rates apply to this project. See Article 01014 of The Supplementary General Conditions. The contract to be awarded is subject to contract compliance requirements mandated by Sections 4a-60 and 4a-60a of the Connecticut General Statutes; and, when the awarding agency is the State, Sections 46a-71(d) and 46a-81i(d) of the Connecticut General Statutes. There are Contract Compliance Regulations codified at Section 46a-68j21 through 43 of the Regulations of Connecticut State Agencies, which establish a procedure for awarding all contracts covered by Sections 4a-60, 4a-60g, and 46a-71(d) of the Connecticut General Statutes. The Contractor who is selected to perform this state funded project must file and receive an approved plan by the Commission on Human Rights and Opportunities prior to the commencement of construction. This project is therefore subject to the state set-aside goals of 25% SBE and 6.25% MBE on the entire state contract amount. The contractor selected to perform this state funded project is therefore encouraged to solicit bids from subcontractors and/or vendors who are currently certified as a minority own business, a disabled owned business, and a woman owned business and/or a small business under the Department of Administration Services' Supplier Diversity Program. Requirements for insurance coverage for the successful bidder are as outlined in THE GENERAL CONDITIONS OF THE CONTRACT. Certificates of coverage for the required insurance shall be submitted to the Owner prior to commencing the Work. EXECUTIVE ORDERS NOS. 3, 7C, 14, 16, AND 17: Bidders are advised that the contracts for this project shall be subject to: Executive Order No. 3: This contract may be subject to Executive Order No. 3 of Governor Thomas J. Meskill, promulgated June 16, 1971, concerning labor employment practices; Executive Order No. 17 of Governor Thomas J. Meskill, promulgated February 15, 1973, concerning the listing of employment openings; Executive Order No. 16 of Governor John G. Rowland, promulgated August 4, 1999, concerning violence in the workplace. This Contract may also be subject to Executive Order 7C of Governor M. Jodi Rell, promulgated July 13, 2006, concerning contracting reforms and Executive Order 14 of Governor M. Jodi Rell, promulgated April 17. 2006, concerning procurement of cleaning products and services, in accordance with their respective terms and conditions. All of these Executive Orders are incorporated into and made a part of the Contract as if they had been fully set forth in it. At the Contractor's request, the Agency shall provide a copy of these Orders to the Contractor. Contract Documents consist of the PROJECT MANUAL containing the INSTRUCTIONS TO BIDDERS, BID FORM, THE GENERAL CONDITIONS OF THE CONTRACT, SUPPLEMENTARY GENERAL CONDITIONS AND TECHNICAL SPECIFICATIONS SECTIONS as are found bound together and the DRAWINGS, both titled "Capital Community College - Playscape Renovations, Hartford, CT #BI-CTC-607" Questions may be addressed to: Project Architect: Bryce Sens, Friar Architecture Inc.: brs@friar.com The work of this contract includes, but is not limited to the following: 1 Removal and storage of existing playscape and structures for reinstallation (by Preferred Vendor); 2 Removal of existing playscape surface and bituminous concrete sub-surface to concrete deck; 3 Repair of existing concrete deck and drainage system as required per review with Engineer; 4 Inspection, testing and repairs to existing trench drain as required per review with Engineer; 5 Reinstallation of playscape structures to concrete deck (by Preferred Vendor); 6 Installation of waterproof membrane, lightweight concrete, and second waterproof membrane 7 Installation of playscape surfacing (by Preferred Vendor); 8 The Contractor will include in their bid, all items required in order to carry out the intent of the Work as described, shown and implied in the Contract Documents. 9 The Work will be constructed under the Contractor's Contract as applicable to this Project.

Final Planning

Playgrounds / Parks / Athletic Fields

$340,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
480
Active Projects
278
Bidding Soon
4,492
All Active Projects
1,868
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

October 14, 2022

img_map_placeholder

950 Main St, Hartford, CT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.