Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2022 at 8:00 PM

Updated October 24, 2023

Renovation of an educational facility in Winnipeg, Manitoba. Completed plans call for the renovation of a educational facility.

The intent of this bid call is to obtain an offer to perform work to complete AHU-5 Heating Coil Replacement at Daniel McIntyre Collegiate Institute, Winnipeg, MB for a Stipulated Price Contract, in accordance with the Contract Documents. Bids shall be accompanied by a bid bond in the amount of 10% of the bid price. Bidders must conform to Winnipeg School Division Bonding and Insurance Requirements. Official bid documents must be obtained from www.merx.com or at https://www.winnipegsd.ca/

Award

Educational

$145,817.00

Public - State/Provincial

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
50
Bidding Soon
516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

July 4, 2022

Project location map

720 Alverstone St, Winnipeg, MB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed