Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Missouri City, Texas. Completed plans call for the renovation of a water / sewer project.
Emergency Generator at Water Plant No. 3 LIQUIDATED DAMAGES FOR DELAYS. This requirement supersedes any other statement in specifications as to liquidated damages for delays. The CONTRACTOR agrees that Time is of the essence of this Contract. The CONTRACTOR and the OWNER understand and agree that a breach of this Contract as to damages cannot be accurately measured or that ascertainment will be difficult. Therefore, the parties agree that for each and every calendar day the work or any portion thereof shall remain uncompleted, after the expiration of the Contract Time set in the Agreement, or as extended under the foregoing provisions for Extension of Time, the OWNER may withhold permanently from the CONTRACTOR'S total compensation 500 Dollars ($500.00). The agreement as to liquidated damages at paragraph 3.2 of the Agreement constitutes only an agreement by the OWNER and the CONTRACTOR as to the minimum amount of damages which the OWNER will sustain in any event by reason of the CONTRACTOR'S failure to complete the work within the specified time. Should the OWNER suffer damage over and above the minimum amount specified, by reason of the CONTRACTOR'S failures to begin the work when ordered, carry it forward uninterruptedly after beginning, or complete it within the specified time in strict accordance with the Drawings and Specifications, the OWNER may recover such additional amount. The OWNER will have the right to deduct and withhold the amount of any and all such damages, whether it be the minimum amount stipulated above or otherwise, from any monies owing by the OWNER to said CONTRACTOR, or the owner may recover such amount from the CONTRACTOR or the Sureties of his bond; all of such remedies shall be cumulative and the OWNER shall not be required to elect any one nor deemed to have made an election by proceeding to enforce any one remedy
Bid Results
Water / Sewer
$619,744.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2022
May 9, 2022
To Be Determined, Missouri City, TX
Related To This Project
Missouri City, TX
--
Missouri City, TX
--
Missouri City, TX
Bid Date: Mar 21 2022
Missouri City, TX
Bid Date: May 20 2022
Missouri City, TX
Bid Date: Mar 03 2022
Missouri City, TX
Bid Date: May 26 2022
Missouri City, TX
Bid Date: May 17 2022
Missouri City, TX
Bid Date: Apr 08 2022
Missouri City, TX
Bid Date: Mar 23 2022
Missouri City, TX
--
Missouri City, TX
--
Missouri City, TX
--
Missouri City, TX
--
Missouri City, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.