BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Missouri City, Texas. Completed plans call for the renovation of a water / sewer project.

Emergency Generator at Water Plant No. 3 LIQUIDATED DAMAGES FOR DELAYS. This requirement supersedes any other statement in specifications as to liquidated damages for delays. The CONTRACTOR agrees that Time is of the essence of this Contract. The CONTRACTOR and the OWNER understand and agree that a breach of this Contract as to damages cannot be accurately measured or that ascertainment will be difficult. Therefore, the parties agree that for each and every calendar day the work or any portion thereof shall remain uncompleted, after the expiration of the Contract Time set in the Agreement, or as extended under the foregoing provisions for Extension of Time, the OWNER may withhold permanently from the CONTRACTOR'S total compensation 500 Dollars ($500.00). The agreement as to liquidated damages at paragraph 3.2 of the Agreement constitutes only an agreement by the OWNER and the CONTRACTOR as to the minimum amount of damages which the OWNER will sustain in any event by reason of the CONTRACTOR'S failure to complete the work within the specified time. Should the OWNER suffer damage over and above the minimum amount specified, by reason of the CONTRACTOR'S failures to begin the work when ordered, carry it forward uninterruptedly after beginning, or complete it within the specified time in strict accordance with the Drawings and Specifications, the OWNER may recover such additional amount. The OWNER will have the right to deduct and withhold the amount of any and all such damages, whether it be the minimum amount stipulated above or otherwise, from any monies owing by the OWNER to said CONTRACTOR, or the owner may recover such amount from the CONTRACTOR or the Sureties of his bond; all of such remedies shall be cumulative and the OWNER shall not be required to elect any one nor deemed to have made an election by proceeding to enforce any one remedy

Bid Results

Water / Sewer

$619,744.00

Public - City

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
58
Bidding Soon
2,712
All Active Projects
1,107
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2022

May 9, 2022

img_map_placeholder

To Be Determined, Missouri City, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.