Published March 29, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a pre-engineered storage facility in Saint Cloud, Florida. Completed plans call for the renovation of a pre-engineered storage facility.

The general scope of work is as follows: Contractor shall perform all work necessary to replace fire damaged sections of the building with new materials and equipment. The quantity and quality of all new materials and equipment shall meet or exceed what was installed previously. Items damaged in the fire include, but are not limited to, concrete, man doors, electrical, walls, and roofing. The installation of a fire detection system is also included as part of this project. Question End Date 3/30/2022 5:00 PM Bid Bond Amount: 5%, Performance Bond Amount : 100%

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$700,000.00

Public - City

Renovation

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
394
Active Projects
190
Bidding Soon
2,484
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 16, 2022

Project location map

2705 Peghorn Way, Saint Cloud, FL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed