BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a pre-engineered storage facility in Saint Cloud, Florida. Completed plans call for the renovation of a pre-engineered storage facility.

The general scope of work is as follows: Contractor shall perform all work necessary to replace fire damaged sections of the building with new materials and equipment. The quantity and quality of all new materials and equipment shall meet or exceed what was installed previously. Items damaged in the fire include, but are not limited to, concrete, man doors, electrical, walls, and roofing. The installation of a fire detection system is also included as part of this project. Question End Date 3/30/2022 5:00 PM Bid Bond Amount: 5%, Performance Bond Amount : 100%

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$700,000.00

Public - City

Renovation

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
325
Active Projects
87
Bidding Soon
2,497
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 16, 2022

Project location map

2705 Peghorn Way, Saint Cloud, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.