BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Botkins, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

THE FABRICATION, DELIVERY AND SETTING-IN-PLACE " of all prestressed concrete box beams necessary to complete the project known as LOCK TWO ROAD BRIDGE REPLACEMENT PROJECT and at same time and place, publicly opened and read aloud. The projects consist of fabrication, delivery and setting-in-place of prestressed concrete box beams on a Shelby County job site. All Materials, Equipment and Labor necessary to perform this service shall be included. . Each bidder is required to furnish a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security in Bond Form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Each Proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit, upon request, evidence of its experiences on projects of similar size and complexity. The owner intends that the prestressed concrete box beams for this project be delivered to the job site with an approximate date of July 5, 2022. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9 shall be required. Bidders must comply with the prevailing wage rates on Public Improvements in Shelby County, Ohio as determined by the Ohio Department of Industrial Relations. The County Commissioners reserve the right to reject any and/or all bids. This notice is posted on Shelby County's internet site on the world wide web. ENGINEERING ESTIMATE $85,000.00.

Bid Results

Bridges / Tunnels

$91,750.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
49
Bidding Soon
1,085
All Active Projects
527
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

April 28, 2022

img_map_placeholder

Lock 2 Rd, Botkins, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.