Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Sauk Centre, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of 04/08/2022 This project has not been awarded. Grading, Concrete and Bituminous Surfacing, Bridge 4641 Replacement and Appurtenant Work Approximate major items of work are: Excavation Common 24775 CU YD; Excavation Subgrade 8942 CU YD; Select Granular Embankment (CV) 10062 CU YD; Common Embankment (CV) 8706 CU YD; Aggregate Base (CV) Class 6 11567 CU YD; Mill Bituminous Surface 53223 SQ YD; Place Concrete Pavement 7" 83396 SQ YD; Structural Concrete 16860 CU YD; 1.25" Dowel Bar 31621 EACH; Reinforcement Bars (Epoxy Coated) 36912 POUND; 12x6 Concrete Box Culvert 112 LIN FT; Bituminous Surfacing 1131 TON; Multi Comp Gr In Pavement Markings (WR) 68748 LIN FT; Site Directions: CSAH 72 from the Todd County Line to 1150 Feet North of CSAH 79 in Sauk Centre, Stearns County, MN
Award
Bridges / Tunnels
$5,603,268.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2022
May 16, 2022
To Be Determined, Sauk Centre, MN
Related To This Project
Sauk Centre, MN
Bid Date: Jan 19 2023
Sauk Centre, MN
Bid Date: Jul 28 2022
Sauk Centre, MN
Bid Date: Jul 14 2022
Sauk Centre, MN
Bid Date: Jan 27 2023
Sauk Centre, MN
Bid Date: Mar 30 2023
Sauk Centre, MN
Bid Date: Sep 06 2023
Sauk Centre, MN
Bid Date: Mar 11 2022
Sauk Centre, MN
Bid Date: Feb 24 2022
Cook, MN
Bid Date: Apr 05 2022
Slayton, MN
Bid Date: Apr 28 2022
Wadena, MN
Bid Date: Apr 28 2022
Moorhead, MN
Bid Date: Apr 27 2022
Tyler, MN
Bid Date: Apr 28 2022
North Oaks, MN
Bid Date: Apr 18 2022
Henning, MN
Bid Date: May 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.