Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2022 at 8:00 PM
Updated November 15, 2023
Site work and paving for a road / highway in Alton, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
This project will be constructed on Fosterburg Road from 450 feet north of Culp Lane to apoint 840 feet south of IL RT 255 in Alton, Illinois. The evaluation criteria and weighting for this project is as follows: Experience and Technical Competence =30%; Capacity and Capability =30%; Past Record of Performance =30%; Local Presence =10%. Consultants should request aproposal packet from the Alton Public Works Department, which is located at 2Emma Kaus Lane in Alton, Illinois. The technical proposal must not contain any cost information. All proposals shall include aconflict of interest form. All proposals shall also include acopy of the consultant's current IDOT prequalification certificate approved in the category of Highways - Roads and Streets. Proposals will be evaluated by the Alton Public Works Department QBS selection committee. Interviews of engineering consultants will not be held for this project.
Conceptual
Roads / Highways
$515,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 6, 2023
Fosterburg Rd, Alton, IL
Related To This Project
Alton, IL
Bid Date: Feb 08 2022
Alton, IL
Bid Date: Mar 29 2022
Alton, IL
Bid Date: Mar 10 2022
Alton, IL
Bid Date: Sep 28 2022
Alton, IL
Bid Date: Oct 03 2023
Alton, IL
Bid Date: Oct 03 2023
Alton, IL
Bid Date: Oct 19 2023
Alton, IL
Bid Date: Mar 01 2022
Alton, IL
Bid Date: Jan 21 2022
Alton, IL
Bid Date: Mar 03 2022
Alton, IL
Bid Date: Jan 26 2022
Alton, IL
Bid Date: Jan 27 2022
Alton, IL
--
Alton, IL
Bid Date: Feb 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
