Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Flint, Michigan. Completed plans call for site work for a bridge / tunnel.
Consists of the removal of the Passenger Boarding Bridge (SN31576) at Gate 10 of Bishop International Airport and relocating the Passenger Boarding Bridge and ancillary equipment to vacant location at Gate 4 of Bishop International Airport. RELOCATION OF EQUIPMENT AND PROJECT COMPLETION SHALL BE COMPLETED WITHIN ONE HUNDRED EIGHTY (180) DAYS, from the date of the Notice of Awarded Contract by the Authority, or the Proposers guarantee date, whichever is less, except for minor replacement, correction, or adjustment of items which do not interfere with the complete operation and utilization of all parts of the work Proposed for by the Authority. The successful Proposer shall complete the work to the satisfaction of the Authority on or before dates specified. Failure to complete the work within 180 days will result in the assessment of liquidated damages in the amount of $50.00 per calendar day. The Award of Contract is subject to the approval of the Bishop International Airport Authority Board of Directors, and availability of funding The Authority reserves the right to accept or reject any or all Proposals, to waive irregularities, and to accept a Proposal which, in the Authoritys opinion, is the most responsive and responsible Proposer who is determined by the Authority to be in its best interests. Final Day to Submit Written Questions April 4, 2022 Anticipated Recommendation to Authority Board April 26, 2022 Contract Award April 29, 2022 Project Completion Date October 26, 2022
Bid Results
Bridges / Tunnels
$72,052.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2022
May 23, 2022
3425 W Bristol Rd, Flint, MI
Related To This Project
Flint, MI
Bid Date: Oct 27 2020
Flint, MI
Bid Date: May 22 2020
Flint, MI
Bid Date: Apr 30 2019
Flint, MI
Bid Date: Dec 15 2016
Flint, MI
Bid Date: May 24 2022
Flint, MI
Bid Date: Apr 17 2023
Flint, MI
Bid Date: Mar 22 2021
Flint, MI
Bid Date: May 16 2022
Flint, MI
Bid Date: Mar 28 2022
Flint, MI
Bid Date: Mar 24 2022
Flint, MI
Bid Date: Apr 11 2022
Flint, MI
Bid Date: Apr 14 2022
Flint, MI
Bid Date: Mar 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.