BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Flint, Michigan. Completed plans call for site work for a bridge / tunnel.

Consists of the removal of the Passenger Boarding Bridge (SN31576) at Gate 10 of Bishop International Airport and relocating the Passenger Boarding Bridge and ancillary equipment to vacant location at Gate 4 of Bishop International Airport. RELOCATION OF EQUIPMENT AND PROJECT COMPLETION SHALL BE COMPLETED WITHIN ONE HUNDRED EIGHTY (180) DAYS, from the date of the Notice of Awarded Contract by the Authority, or the Proposers guarantee date, whichever is less, except for minor replacement, correction, or adjustment of items which do not interfere with the complete operation and utilization of all parts of the work Proposed for by the Authority. The successful Proposer shall complete the work to the satisfaction of the Authority on or before dates specified. Failure to complete the work within 180 days will result in the assessment of liquidated damages in the amount of $50.00 per calendar day. The Award of Contract is subject to the approval of the Bishop International Airport Authority Board of Directors, and availability of funding The Authority reserves the right to accept or reject any or all Proposals, to waive irregularities, and to accept a Proposal which, in the Authoritys opinion, is the most responsive and responsible Proposer who is determined by the Authority to be in its best interests. Final Day to Submit Written Questions April 4, 2022 Anticipated Recommendation to Authority Board April 26, 2022 Contract Award April 29, 2022 Project Completion Date October 26, 2022

Bid Results

Bridges / Tunnels

$72,052.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
103
Bidding Soon
1,404
All Active Projects
595
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2022

May 23, 2022

img_map_placeholder

3425 W Bristol Rd, Flint, MI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.