Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Lexington, Kentucky. Completed plans call for the renovation of a educational facility.
This project is a renovation of classroom 123. Work includes removal of an existing wing wall, new acoustical ceiling with new LED lights, HVAC modifications, new flooring, new whiteboard, and new paint. System Balancing and Certification required: A preliminary air balance of each affected/project space (hereafter referred to as the 'space') is required PRIOR TO BEGINNING OF CONSTRUCTION. Tab contractor is to perform airflow measurements of all supply diffusers, air supply valves and return grilles. Airflow this each space shall be measured at maximum and minimum conditions. Each supply, return, and exhaust GRD shall be measured at both minimum and maximum positions and the airflow values recorded. Testing shall be performed by an independent NEBB or AABCcertified TAB contractor. The initial certified report shall be provided to the owner prior to startup of the new air valves and control system. As room airflow conditions may have changed since the original installation, re-balancing of each space required. Provide a final, certified air & water test and balance of the hot water coil(s) and a repeat of the initial test, with all valves, supply diffusers, exhausts, and return grilles measured at both the minimum and maximum operating conditions. The time for substantial completion for all phases shall be 55 Calendar Days from listed start date on work order and Final Completion shall be 15 days thereafter. Substantial Completion will include all site restoration completed, site clean-up and fully functional. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of bids. Clerical errors and omissions in the computation of the lump sum shall not be cause for withdrawal of the bid without forfeiture of bid bond. Bids may be withdrawn in person only, prior to the closing date for receipt of bids The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. Anyone wishing to discuss specific items is requested to submit the items in writing to Mike Guyette Construction Procurement, no later than 3 PM on Tuesday 3/22/2022. Written questions can be submitted by email to: cckbidquesfions@uky.edu
Award
Educational
$49,900.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 5, 2022
May 6, 2022
To Be Determined, Lexington, KY
Related To This Project
Lexington, KY
--
Lexington, KY
Bid Date: Apr 20 2022
Lexington, KY
Bid Date: Mar 22 2022
Lexington, KY
Bid Date: May 02 2019
Lexington, KY
Bid Date: Mar 22 2022
Lexington, KY
Bid Date: Mar 17 2022
Lexington, KY
Bid Date: Apr 01 2022
Lexington, KY
Bid Date: Feb 15 2022
Lexington, KY
Bid Date: Apr 13 2022
Lexington, KY
Bid Date: Mar 24 2022
Lexington, KY
Bid Date: Mar 24 2022
Lexington, KY
Bid Date: Jan 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.