BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work, paving, outdoor lighting and new construction of a mixed-use development in Fuquay Varina, North Carolina. Completed plans call for the construction of a conference / convention center; for site work for a conference / convention center; sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; water / sewer project; and bridge / tunnel.

The contractor shall provide all materials, tools, machinery, labor, and supervision necessary for the construction of the Northwest Convenience Center. Construction shall include clearing and grubbing, erosion and sediment control permitting (NDPES Construction General Permit) and implementation, stormwater improvements, on-site soil borrow area development, structural filling, gravel and paved roadways, concrete retaining wall and pads for solid waste and recycling compactors, electrical service, compactor power and site lighting, attendant building, site stabilization, fencing and gates, traffic control, and ancillary work. Compactor and hopper supply and installation will be by others, Contractor shall coordinate. Attendant Building shall be pre-fabricated structure with 100 SF interior area to serve as an office and workstation for a single facility attendant. Building shall include moisture resistant wall and roof panels, VCT flooring, laminated counter and shelving units for document storage, electrical panel with 12-pole load center for receptacles, lighting and other loads in the building, through wall combination type heating, ventilation, and air conditioning system. Building shall be equipped with telephone and data line, connections and ports. Window glazing shall provide visible line of site to incoming traffic and compactor loading areas. All accessories, trim, framed opening, flashing enclosures required to provide a completely watertight and functioning building complying with all requirements and applicable codes shall be provided. Contractor shall install the building in accordance with manufacturer's recommendations, including permanent anchoring to a concrete pad or footings. Contractor shall be required to furnish Performance and Payment Bonds at 100% of the contract value. Send all inquiries regarding this RFP and request for site visits to purchasing.support@harnett.org. The County reserves the right to reject any or all proposals for incompleteness, and to waive minor irregularities in the evaluation process. County also reserves the right to further negotiate minor modifications with the successful proposer upon completion of the evaluation process prior to the execution of a final contract.

Award

Conference / Convention Centers

$1,758,000.00

Public - County

New Construction, Outdoor Lighting, Paving, Site Work

25

15

6

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
149
Bidding Soon
1,756
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2025

July 7, 2025

Project location map

1979 Oakridge River Rd, Fuquay Varina, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.