BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Cleburne, Texas. Completed plans call for the renovation of a educational facility.

Base Proposal: A. Prep all walls, doors, door jambs, window frames and columns that were previously painted (excluding aluminum storefronts). B. Fill all holes, repair wall board cracks and damage sheetrock, and remove all foreign objects on walls. C. Remove all electrical switch, and outlet plate covers and plate wall covers. D. All cut-ins should be done first and cut-in brush mark should be rolled out wet to less than 1/2 " or less. E. Paint over all artwork (Will determine at walk-through). F. Paint the entire interior. G. Paint color selections will be approved by Cleburne ISD prior to starting the project. H. No painting required on any stained wood areas. I. Tape and cut in around existing cove base that cannot be removed. J. Use block filler primer on areas that have not previously been painted in stairwells, and entry corridors. K. Prime areas currently painted a dark color to ensure no bleed through as required. L. Paint all metal doors, jambs and window frames with oil base enamel (excluding aluminum storefronts). M. Paint all walls with Sherwin Williams Pro-Mar 200 or Equal acrylic gloss interior paint (color determined by the district) Kitchen to be Epoxy N. Provide a payment and performance bonds for the full amount as required by district policy. O. The project for Irving and Santa Fe will start after May 25, 2018 and be complete by July 9, 2018. All other schedule painting time will be approved first by the CISD's representative before proceeding. P. The project for Administration Central Office will start after March 9, 2018 and be complete by March 17, 2018. All other schedule painting time will be approved first by the CISD's representative before proceeding. Base Proposal: 1. Interior and Exterior painting and minor drywall repair of Marti Elementary School 2020 W Kilpatrick, Cleburne, Texas 76033 2. Interior and Exterior painting and minor drywall repair of Coleman Elementary School 920 W Westhill St, Cleburne, TX 76033 3. Interior and Exterior painting and minor drywall repair of Cooke Elementary School 902 Phillips St, Cleburne, TX 76033 Any questions should be directed to Kurt Benson, Director of District Maintenance (kbenson@c-isd.com) for Cleburne I. S. D., 817-202-1182. In addition, specifications may be picked up at the Cleburne ISD Maintenance Building located at 2403 North Main Street, Cleburne, Texas or on our website Proposal/Bid Bond - Each Proposal shall be accompanied by a cashier's check or certified check made payable to Cleburne ISD, or a Proposal bond, duly executed by the Proposer as principal and having surety thereon as a surety company approved by Cleburne ISD, in the amount of five (5%) percent of the total Proposal. The Proposal security must be enclosed in the same envelope as the Proposal. Owner reserves right to reject any or all Proposals and to waive irregularities or informalities as may be deemed in Owner's interest.

Post-Bid

Educational

$80,000.00

Public - City

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
189
Bidding Soon
4,868
All Active Projects
1,972
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 5, 2022

May 5, 2022

July 31, 2022

img_map_placeholder

Multiple Locations, Cleburne, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.