BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2024 at 7:00 PM

Updated January 27, 2024

Site work and new construction of a municipal facility in Colorado Springs, Colorado. Conceptual plans call for the construction of a municipal facility; and for site work for a municipal facility.

As of January 4, 2024, design firm information has not been disclosed. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Question Acceptance Deadline 04/05/2022 02:30 PM EDT Questions are submitted online No The City of Colorado Springs is seeking proposals from professional Architectural and Engineering firms, with expertise in projects using funding from the federal and state government and Joint Development Projects, combining transit and mixed-use private development. The City is proposing to use a public private partnership model to create a mixed use development comprised of a new multi-modal downtown transit center to replace its existing Downtown Transit Terminal currently located at the southwest corner of Nevada Avenue and Kiowa Street, which new transit center is intended to operate as a multimodal transportation center to serve as a hub for Mountain Metro Transit local bus operations; Bustang and Greyhound intercity bus operations; taxis and transportation network companies; bike share; and pedestrians (collectively, the "DTC"). The DTC will be designed to be welcoming and include parking facilities and an attractive and convenient customer waiting area/lobby, with easy and safe bus access, circulation, ingress, and egress. Additionally, the City desires to cooperate with Developer to enable development of integrated or adjacent private uses including shared parking facilities and new residential, office, retail, restaurant or hospitality development (collectively, the "Private Improvements"). Collectively, the DTC and the Private Improvements will constitute the "Project." The City, Enterprise and Developer will determine their respective responsibilities as they relate to the various project components in a collaborative planning and design process. Additionally, the developer anticipates utilizing the air-rights above the DTC for high-density mixed-use commercial real estate activities including, but not limited to residential, commercial/office and/or hospitality. Buyer's Requirements General Requirements - Insurance Required - Federally Funded Award Requirements - All or None Award

Conceptual

Municipal

$2,000,000.00

Public - City

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
68
Bidding Soon
985
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2024

Project location map

222 E Pikes Peak Ave, Colorado Springs, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.