BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2024 at 8:00 PM

Updated July 18, 2024

Site work and new construction of a mixed-use development in Tomah, Wisconsin. Completed plans call for the construction of a 4,800-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

SOL : 36C77622R0044, 676-233, 36C77624Q0089 In accordance with 38 U.S.C. 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion to Expand and Renovate the B404 for Outpatient Mental Health Minor construction project, in accordance with the attached Specifications and Drawings. This project is located at the: Tomah VA Medical Center 500 East Veterans Street Tomah, WI 54660 VAAR Magnitude of Construction: $1,000,000 to $2,000,000 In accordance with 38 u. s. c. 8104, Contracting Officer's shall not award contracts for minor construction projects in excess of the major construction statutory limit for a VA major medical facility project. This amount is currently defined as $34,000,000, which is inclusive of all construction, design and contingency costs. The Government cannot guarantee additional funds will be made available for award (reference 38 U.S.C. 8104). Successful offerors must be a SDVOSB for the applicable NAICS for this requirement which is 236220 and Product/Service Code: Y1DZ - Construction of Other Hospital Buildings. Questions of a technical nature must be provided in writing and shall be submitted by the prospective offerors to all; Lucretia Maloney, Megan B. Johnson and Gabriel D. Escarciga. Questions shall be submitted only via e-mail to: Lucretia.Maloney@va.gov, Megan.Johnson9@va.gov and Gabriel.Escarciga@va.gov. The subject line must read: 676- 233 Tomah - Minor - Construct Material Shed - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS June 25, 2024, at 2:00 PM (EST). No additional Questions will be entertained past this date without prior indication by the Contracting Officer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$2,000,000.00

Public - Federal

New Construction, Site Work

37

33

7

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
54
Bidding Soon
718
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

September 13, 2024

Project location map

500 E Veterans St, Tomah, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.