BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a water / sewer project in Fort Walton Beach, Florida. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Construction of new Lift Station No. 22. The existing Lift Station No. 22 is in need of replacement due to a lack of storage capacity, structural deterioration, and a hazardous work environment. The integrity of the concrete, piping, and valves has suffered from hydrogen sulfide damage which will not allow for refurbishing or extensive modification. The current lift station configuration (interior piping, valves and pumps) does not have any safety measures in place for service and repair which makes this lift station the hazardous now in use for employee safety. The service area of this lift station is along Beal Parkway corridor. The City currently owns ample property at the existing site for this needed expansion and up-grade. This proposed up-grade would add both station storage and pumping capacity to meet the projected system flow increase along with meeting the current OSHA safety requirements for operator safety FY 2022 Construction of new Lift Station No. 22. As of March 18, 2022, this project is included in the City of Fort Walton Beach's FY 2022-2026 Capital Improvement Program (CIP). Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Conceptual

Water / Sewer

$400,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
26
Bidding Soon
437
All Active Projects
185
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

img_map_placeholder

To Be Determined, Fort Walton Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.