Renovation of a water / sewer project in Cherry Point, North Carolina. Completed plans call for the renovation of a water / sewer project.

Contract Award Date: May 10, 2022 Contract Award Number: N4008519D8044 Task/Delivery Order Number: N4008522F5115 Contractor Awarded Unique Entity ID: PAL3KHU82R65 Contractor Awarded Name: Joyce & Associates Construction, Inc. Contractor Awarded Address: Newport, NC 28570-3728 USA Base and All Options Value (Total Contract Value): $287415.51 Public Works Project No.: 7144400 Title: B4977 WTP Provide Strainer Platform and Hoist NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction, $36.5 Million Contract Completion Date: All work shall be completed within 120 calendar days after award. Estimated Cost Range: Between $100,000 and $250,000. Wage Determination: General Decision Number: NC20220065 02/25/2022 Liquidated Damages: $106.00 per Calendar Day Special Scheduling: None Basis for Award: Lowest Price Proposal Acceptance Period: 90 days from receipt of offers Site Visit: A site visit will be scheduled Thursday 17 March 2022 at 1330. Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project. Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. An electronic copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. BONDS TO BE PROVIDED ELECTRONICALLY, SEALS MUST BE VISIBLE. o No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only. o Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. B4977 WTP PROVIDE STRAINER REQUEST FOR PROPOSAL PLATFORM AND HOIST MCAS Cherry Point, North Carolina Project No. 7144400 FAR Clause 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 is applicable for this solicitation. Proposal Due Date: 5 April 2022, 1200 local time Specific Directions for this RFP: All contractors are required to complete the supplementary instructions to offerors form (00.22.13 20) and submit it with their proposal. If this is not completed and submitted with the proposal their proposal will be considered non-responsive. E-Mail Address for Proposals: 1. roicc_chpt_ktr_bids@navy.mil 2. joseph.a.schwarz4.civ@us.navy.mil 3. ericka.j.bishop.civ@us.navy.mil Requests for Information (RFIs): RFIs must be submitted to the email addresses above. The cut off for RFIs is 25 March 2022 by 0900 in order to process all inquiries by the proposal due date. The specifications and drawings are post Project Description The work includes providing a structural steel frame to support a 0.5 ton trolley with electric hoist and a grated walkway to provide maintenance to strainers at the water treatment plant, Bldg. 4977 and incidental related work. 1.2.2 Location The work is located at MCAS Cherry Point, approximately as indicated. The exact location will be shown by the Contracting Officer. 1.3 OCCUPANCY OF PREMISES Buildings will be occupied during performance of work under this Contract. Occupancy notifications will be posted in a prominent location in the work area. Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$287,415.00

Public - Federal

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
348
All Active Projects
154
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 13, 2022

img_map_placeholder

To Be Determined, Cherry Point, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.