Published May 23, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a power facility in Hastings, Nebraska. Completed plans call for the renovation of a power facility.

All Work shall be produced in accordance with the current laws, ordinances, regulations, codes, standards, and rules applicable to Professional Engineers practicing in the state of Nebraska. If required by the applicable current laws, ordinances, regulations, codes, standards and rules; the Supplier design documents (calculations, drawings, specifications, statements of special inspections, certificates of compliance, etc.) shall be certified and sealed by an engineer licensed to practice in the state of Nebraska and shall be submitted to the Purchaser. Please Contact Any of the Following: Technical Questions Dale Reinhold and Lee Vrooman, City of Hastings 1228 N. Denver Avenue Po Box 289 (68902) Hastings, Ne 68901 Ph# 402-462-3661 Cell# 402-432-4682 Email: Bidquestions@cityofhastings.org. General Questions or Requests contact: Renae Griess Administrative Assistant - Engineering Dept. City of Hastings Ph# 402-462-3665 Fax# 402-462-3666 Email: bidquestions@cityofhastings.org The successful bidder will be required to furnish a Maintenance Bond in the sum of the full amount of the Contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Performance Bond. A certified check, cashiers check, or bid bond payable to the City of Hastings in an amount no less than five percent (5%) of the bid price included with the sealed bid envelope addressed in accordance with the Mailing or Hand Delivery Instruction City of Hastings reserves the right to reject any or all proposals and may waive any informalities and may accept the proposal which best suits its needs. It is further understood that this proposal may not be withdrawn for a period of sixty days (60) days after bids are opened

Award

Power Plant

$2,365,263.00

Public - City

Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
9
Bidding Soon
157
All Active Projects
80
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2022

May 20, 2022

img_map_placeholder

Multiple Locations, Hastings, NE

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Power Distribution Center Building With Installed 15 KV Switchgear

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.