Published July 6, 2022 at 8:00 PM

Updated February 13, 2024

Site work and paving for a sidewalk / parking lot in Kent, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bids will be received for: CONTRACT: GENERAL ESTIMATED BASE BID COST: $320,000.00 TOTAL ALTERNATE COST ESTIMATE: $353,784.98 The time for Substantial Completion is 96 consecutive days from the Notice to Proceed and shall be achieved no later than Friday, August 12th, 2022. The Bidder must include a Bid Guaranty and Contract Bond for 100% of the amount of their bid or a certified check in the amount of 10% of their total bid. See Section 153.54 of the Ohio Revised Code. Portage County Prevailing Wages and Equal Employment Opportunity requirements are applicable to this Project. The Bidder may be subject to a Pre-Award Affirmative Action Compliance Review in accordance with Section 123:2-5-01 of the Ohio Administrative Code including a review of the Bidder's employment records and an on-site review. This Project is subject to the State of Ohio's Encouraging Diversity, Growth, and Equity ("EDGE") Business Development Program. The Bidder is required to submit with their Bid and with their Bidder's Qualifications form, certain information about the EDGE-Certified Business Enterprise(s) participating on the Project with the Bidder. The EDGE Participation Goal for the Project is nine percent (9%). The percentage is determined by the contracted value of goods, services, materials, and labor that are provided by EDGE-certified business(es). The participation is calculated on the total amount of each awarded contract. The Bidder must indicate on the Bid Form, the locations where their services will be performed in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D related to providing services only within the United States. Failure to do so may cause the Bid to be rejected as non-responsive. Domestic Steel Use Requirements as specified in Ohio Revised Code Section 153.011 apply to this Project. Copies of Ohio Revised Code Section 153.011 can be obtained from any of the offices of the Ohio Department of Administrative Services. Bidders are encouraged to be enrolled in and to be in good standing in a Drug Free Safety Program ("DFSP") approved by the Ohio Bureau of Workers' Compensation prior to submitting a Bid and provide, on the Bid Form with their Bid, certain information relative to their enrollment in such a program; and, if awarded a Contract, shall comply with other DFSP criteria described in General Conditions Paragraph 1.10 - Drug Free Safety Program Participation. The OAKS Capital Improvements module, Ohio's Web-based project management system, is being utilized for the Project. The Contractor shall use OAKS CI module for all compatible services required under the Contract. All costs for the Contractor's use of OAKS CI for the Project shall be included in the Contract Sum, and additional compensation shall not be provided. If the Contractor is unfamiliar with the proper use of OAKS CI, the Contractor shall provide its employees for training without additional compensation. Technical questions should be referred to: Chris Dewey at Van Auken Akins Architects LLC; 1422 Euclid Ave #1010 Cleveland, OH 44115; Telephone: 216-241-2220 FAX: 216-241-2221; E-mail: edewey@vaakins.com E-mail is preferred. The University reserves the right to reject any or all bids. Project consists of ADA Improvements. In addition, various alternate bid work may be included. Project scope is for all work of all trades, complete, as indicated on the Drawings and specified herein in a single-prime contract. 2. Other Work as indicated in the Contract Documents, but not necessarily described above. 3. Drawings, Use of: Do not scale the Drawings. If the Contractor chooses to calculate measurements by scaling the Drawings, it is at their own risk and is not considered to be an accurate measurement. The Contractor is responsible for the accuracy of measurements, elevations, lines, and grades of the Work. FLOOR 1 AREA OF WORK 492 SF FLOOR 2 AREA OF WORK 844 SF

Award

Sidewalks / Parking Lot

$311,000.00

Public - State/Provincial

Paving, Site Work

35

20

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Temporary Ramps, Vehicular Access and Parking, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Clocks, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Convectors
Division 26 - Electrical

Division 26 - Electrical

Electrical, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
84
Bidding Soon
1,360
All Active Projects
541
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

May 31, 2022

img_map_placeholder

850 University Esplanade Kent, Kent, OH

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Kent State University - Kent Campus ADA Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.