BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Ware, Massachusetts. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; water / sewer project; and water / sewer project.

The Town of Ware is seeking bids for the "Ware Mass Central Rail Trail Phase II" project. This phase of the project is to install a stone dust surface on the trail to complete the portion of the Mass Central Rail Trail between Longview Avenue and Mountain View Drive. This work will include approximately .75 miles of the MCRT trail, involve grading for drainage, and grading near two bridge crossings for ADA accessibility. More detail will be provided in the scope of services packet. This phase of the project will take place along two portions of the MCRT between Longview Avenue and Malboeuf Road, and the second which between Malboeuf Road and Mountain View Drive (shown on Item #1). This work will include approximately .8 miles of the MCRT trail, which is currently under use and open to the public. The Town is looking for the following items to be completed with this work: 1. Regrade the portion of trail East of Longview Ave. to create a drainage swale along the north side of the trail. 1 1/2 " crushed gravel material should be used to raise the grade of the trail sufficiently enough to allow positive water flow to the swale. 2. The section of trail halfway between Longview Ave and Malboeuf Rd. should be graded to eliminate the low area holding water in the trail. Drainage swale along the side of the trail is to be created to allow for proper drainage of the trail surface. 3. Lower the manhole cover to the east side of the foot bridge on the east side of Malboeuf Rd. to lessen the steep grade of the trail between the manhole cover and the bridge. This is to make the trail more ADA accessible. 4. Raise the grade of the trail on the west side of Mountain View Dr. to create less of a grade and a more level approach to the road. 2. The section of trail halfway between Longview Ave and Malboeuf Rd. should be graded to eliminate the low area holding water in the trail. Drainage swale along the side of the trail is to be created to allow for proper drainage of the trail surface. 3. Lower the manhole cover to the east side of the foot bridge on the east side of Malboeuf Rd. to lessen the steep grade of the trail between the manhole cover and the bridge. This is to make the trail more ADA accessible. 4. Raise the grade of the trail on the west side of Mountain View Dr. to create less of a grade and a more level approach to the road. 5. Lay hard pack material on MCRT surface consisting of 3/8" dense grade stone dust at a minimum of 3" depth. Material should be applied with a paver and compacted with a vibratory roller. 6. All drainage swales shall be lined with 3" angular crushed stone to mitigate erosion. Lay stone covering on 4000 feet of Ware River Valley Rail Trail. Drainage and ADA grading near stream crossings

Award

Roads / Highways

$69,750.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
674
Active Projects
404
Bidding Soon
5,318
All Active Projects
2,206
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.