BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Hoffman Estates, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Provide a bicycle/pedestrian crossing of I-90 along Beverly Road, resurface pavement between Prairie Stone Parkway and Beacon Pointe Drive, and provide maintenance to the existing bridge deck on Beverly Road over I-90. Phase I engineering has been completed and was partially funded by a Cook County Invest in Cook Grant. Phase II engineering is ongoing and is partially funded by a Cook County Invest in Cook grant. The project will receive STP-L funding covering 75% funding construction and construction engineering costs up to a maximum amount of $1,872,750. Project estimated costs have increased since the completion of Phase I due to inflation and scope increase for bridge deck repairs. This project is included in the FY2024-2028 Capital Improvement Program for the Village of Hoffman Estates. As of May 23, 2024, project is in construction March 2024-November 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Roads / Highways

$2,700,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
100
Bidding Soon
2,093
All Active Projects
899
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

img_map_placeholder

Beverly Rd, Hoffman Estates, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.