BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Louisville, Kentucky. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project consists of the removal of the existing play equipment, fencing, timber retaining wall, and associated features. A new playground has been designed to facilitate the developmental needs of the children at the Kentucky School for the Blind. Work includes site work to facilitate the installation of new play equipment, the reinstallation of existing salvaged play equipment, security fencing and gates, concrete sidewalks, and poured-in-place rubber safety surface. Estimated Length of Project: 140 (Substantial Completion) + 7 (Final Completion) = 147 days

Bid Results

Sidewalks / Parking Lot

$331,020.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
108
Bidding Soon
1,709
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

May 12, 2022

Project location map

1867 Frankfort Ave, Louisville, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.