BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Kent, Ohio. Completed plans call for the renovation of a laboratory facility.

As of May 19, 2022 This project is awarded to Lakeland with awarded amount of $1,277,000.00. Project is already under construction. https://www.news-herald.com/2022/05/07/kent-state-geauga-applauded-for-planning-major-renovations-editorial/ - It's always exciting to see area schools update their buildings in ways to enhance learning experiences and services for students. That's why we were pleased to learn about some upcoming renovations planned at Kent State University Geauga Campus in Burton Township. Kent State Geauga is embarking on two facility improvements that will include constructing a new nursing lab with instructional space and creating a new student learning commons. In 2019, Kent State Geauga began a comprehensive assessment to determine current and future campus facility needs, including discussions with students, faculty, staff and community members. Now, Lakeland Construction of Painesville is set to begin work May 16. "This is all about our students. We want to give our students the best possible environment for them to study and learn in," said Angela Spalsbury, dean and chief administrative officer. "This building is 50 years old, so we need to update it." The new nursing skills education center is intended to provide students with modern training equipment in an environment designed to maximize learning objectives, which will lead to post-graduation employment. The classroom and skills lab will be the central training area and will feature work training stations and classroom seating. Students are expected to benefit from both hands-on experience and faculty interaction. In addition, two new rooms will simulate a standard hospital room, equipped with high-fidelity patient simulators. The central control room will allow faculty members to simulate real-life scenarios for students and observe their performance. The skills lab training stations will feature the opportunity for experiential student training. Each station will be equipped with a medical mannequin and headwalls to replicate an actual hospital room. "Our current library will become our new nursing skills lab and classroom," Spalsbury said. "We're really excited about that because our nursing program is the only bachelor of science nursing program in Geauga County. "We currently have one simulation mannequin, which is great for students because they can practice high-risk procedures in a very low-risk or zero-risk environment. We're looking to get a second one." The student learning commons will provide an area for students to collaborate, study and gather outside of class. This area will include technology resources and library services, as well as food and beverage services. The student study lounge will be located within the learning commons and provide an open, comfortable area for student collaboration. The quiet study lounge will be a separate area students can use to study and prepare for class as well as access library services. "We're kind of swapping two areas, so the area where our current nursing lab is will become a student engagement center and learning commons, opening up into what is now our student lounge," Spalsbury said. "The whole side of the building over there will be one big open space with some glass walls. "We're also excited to be bringing food service here," she added. "That is the single biggest complaint we hear from students daily -- we do not have food, so we're excited Kent State Dining Services will be here. "The learning commons -- students will be able to access library services, tutoring and all of the typical academic services. There'll be space for group study and individual study space, and lots of flexible furniture. This is what students want so they can work together." The university is currently fundraising for the renovations project. Those interested in learning more or donating can contact Spalsbury at 440-834-3714. Preston Superstore contributed $20,000 toward the project. "We're excited to be a part of these renovations and we hope our gift can jumpstart some more gifts so that all this can come to fruition," said Jackie Preston. More than 6,000 people in Geauga County are employed in the healthcare industry and 60 percent of all Northeast Ohio nurses are Kent State graduates. "We have great students and we want to provide them with the same opportunities they would have if they went to any Kent State campus," Spalsbury said. The News-Herald commends the leaders of Kent State Geauga for launching a project that will add some significant new features to its campus. We're sure that these upgrades will be appreciated by current and future students of the college. _____________________________________________________________________________________________________________________________________________________________________ https://www.news-herald.com/2022/05/12/kent-state-universitys-geauga-campus-granted-over-700000-from-state-for-renovations/ State Rep. Diane Grendell, R-Chester Township, recently announced that Kent State University has been granted $711,085 for the renovation of the Geauga nursing lab via the Ohio State Controlling Board. This project is intended to enhance the Geauga Campus in Burton Township and create a better experience for students, teachers and the surrounding communities. It will include new HVAC, electrical, technology and interior build-out to provide state _____________________________________________________________________________________________________________________________________________________________________ Message for Project: KSU - Geauga Nursing Lab Renovation EDGE Participation Goal for the Project is nine percent (9%). If you have a question regarding this or need immediate attention, please contact: Planwell Administrator: Ron Groh The time for Substantial Completion is 92 consecutive days from authorization to proceed On-Site. Substantial Completion shall be achieved no later than Friday, August 12, 2022. The time for Contract Completion is 131 consecutive days from the Notice to Proceed with the Project.

Under Construction

Laboratories

$1,277,000.00

Public - State/Provincial

Renovation

50

31

14

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
75
Bidding Soon
1,244
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2022

May 16, 2022

img_map_placeholder

615 Loop Rd, Kent, OH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.