BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Columbus, Nebraska. Completed plans call for site work for a bridge / tunnel.

The project sites are located as follows: C-71(812) on 287 Avenue between Highway 30 and West Cedar Drive (in Polk County), and C-71(571) on 385 Street between 415 Avenue and 430 Avenue, both in Platte County, Nebraska. The project is referred to as Platte County 2022 CBC s: C-71(812) & C-71(571) and shall include all labor, materials, transportation and equipment required to construct: C-71(812) twin 12 x 6 x 50 concrete box culvert on a 0 degree skew, and C-71(571) triple 10 x 8 x 42 concrete box culvert on a 15 degree skew (lhb), and other related incidental work. All Bid Proposals must be submitted on the forms furnished with the Bid Documents. The sealed bids may be mailed or delivered to the Platte County Clerk, Platte County Courthouse, 2610 14th Street, Columbus, NE 68601, and should be plainly marked as, Construction Bid Proposal Platte County 2022 CBC s: C-71(812) & C-71(571) . Along with its Bid Proposal, each bidder shall submit an unconditional Bid Bond or Certified Check payable to the County Treasurer of Platte County, Nebraska, in an amount equal to five (5) percent of the Bid Proposal. Also, each bidder is to provide a Start of Construction date and End of Construction date with its Bid Proposal. The desired completion date is August 1, 2022 for project C-71(812) and October 31, 2022 for C-71(571). The successful bidder (i.e. Contractor) will be allowed sixty (60) calendar days for completion of each site after beginning work at that site, provided they do not exceed their specified completion dates for each site. Additional days due to weather may be granted at the discretion of the Engineer. Within ten (10) days following the award of the Contract. The surety and form of the bonds are subject to acceptance by the Platte County Board of Supervisors. The Platte County Board of Supervisors reserves the right to reject any and all bids or to waive any irregularities in bids received. Award of the Contract will be in accordance with the County Purchasing Act s competitive bidding considerations as set forth in Neb.Rev.Stat. 23-3110 to 23-3114. Platte County is an Equal Opportunity Employer.

Post-Bid

Bridges / Tunnels

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
46
Bidding Soon
503
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2022

May 9, 2022

img_map_placeholder

Multiple Locations, Columbus, NE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.