Site work and paving for a sidewalk / parking lot in Ocala, Florida. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

*** As per Jennifer Allcock, the project received no bids and will be readvertised. The schedule for the readvertisement is currently unknown. (As of 04/13/2022) District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping Please direct all questions to: JENNIFER ALLCOCK Phone: (000) 000-0000 719 S. Woodland Blvd DeLand FL, 32720 Email: D5.ProcurementQuestions@dot.state.fl.us DEADLINE FOR ALL QUESTIONS April 4, 2022 2:00 PM QUESTIONS AND ANSWERS POSTED BY April 7, 2022 2:00 PM POSTING OF INTENDED AWARD TO April 18, 2022 By 2:00 PM Order contract will begin on or about April 22, 2022. All work must be completed by June 30, 2022. On projects where the base bid, and the sum of all additive alternates exceed $100,000, a five percent (5%) bid guaranty shall accompany the bid proposal. The Department reserves the right to accept or reject any or all bids received and reserves the right to make an award without further discussion of the bids submitted. Therefore, the bidder should make sure that the bid package submitted is complete and accurate and submitted to ensure delivery on or before the bid opening time and date specified in this solicitation. It is understood that the bid will become a part of the Department's official file, without obligation to the Department. The Florida Department of Transportation (FDOT) - District Five (Department), seeks a qualified, experienced, and licensed contractor to perform (1) new pavement construction and striping of 2,240 Sq. Ft. of asphalt, (2) milling, paving, and restriping of approximately 20,100 Sq. Ft. of asphalt including regrading of up to 3,800 Sq. Ft., and (3) removal of approximately 315 Sq. Ft. of asphalt and concrete at the FDOT Ocala Operations Complex (Facility). Add alternate: milling, paving, and restriping approximately (a) 43,560 Sq. Ft. in Central section and (b) 62,200 Sq. Ft in South section. A. Asphalt Pavement Construction & Striping - New Parking Lot North of Administrative Building: {Approximately 2,240 Sq. Ft. @ 1.5 inch depth} A.1. Excavate native material and compact sub grade in preparation for new construction. A.2. Install base, roll and compact, and meet L.B.R./compaction requirements. (i.e., 6.5" crushed base course material compacted to 98% of max density with a 3-5 ton roller) A.3. Tack new crushed base course material, as needed, using SS-1h primer coat. A.4. Install 1.5" average Type SP 9.5 hot mix asphalt. A.5. Roll and compact with a 3-5 ton roller. A.6. Remove and haul away any related debris from site. A.7. Clear away loose dirt and debris. Layout and paint new pavement markings per existing using DOT approved latex traffic paints to include: 4" LF, stall lines and handicap stalls. B. Asphalt Mill, Pave, and Restriping of Existing Asphalt - North & West Sections: {Approximately 20,100 Sq. Ft. @ 1.25 inch depth} B.1. Mobilize equipment to the job site. B.2. Regrade approximately 3,800 Sq. Ft. (North-West Drive) as needed. B.3. Mill existing asphalt surfaces to a depth of 1.25". Continue milling if hit lime rock to help maintain level area. B.4. Clean entire milled surface with power street brooms. B.5. Apply SS-1h tack coat to prepared surface areas. B.6. Install 1.25" average overlay with Type SP 9.5 hot mix asphalt surface mix. B.7. Roll and compact using a 4-6 ton steel drum roller and a rubber tire traffic roller. B.8. Inaccessible areas will be mechanically or hand compacted. B.9. Remove and haul away any remaining debris from site. B.10. Parking Lot Striping: Clear away loose dirt and debris. Layout and paint new pavement markings per existing using DOT approved latex traffic paints to include: 4" LF, stall lines and handicap stalls. C. Remove Asphalt and Concrete - West of Fuel Island {Approximately 315 Sq. Ft.} C.1. Excavate asphalt and concrete material. C.2. Rough grade surface. C.3. Remove and haul away any related debris from site

Final Planning

Sidewalks / Parking Lot

$300,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
68
Bidding Soon
1,239
All Active Projects
494
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2022

October 24, 2022

img_map_placeholder

627 NW 30th Ave, Ocala, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.