BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in L'Orignal, Ontario. Completed plans call for site work for a bridge / tunnel.

The United Counties of Prescott and Russell are seeking a Successful Bidder to perform the rehabilitation of Bélanger Bridge (Structure 08-308) as specified in this Bid document. This Bid request involves, but is not necessarily limited to, the following: - Mobilize to site - Close road to traffic and set up detour route - Install construction enclosures, environmental protection, and erosion / sediment control measures - Remove steel beam guide rail on approaches, including end treatments - Remove asphalt and waterproofing on bridge deck - Remove asphalt at approaches (full depth) - Remove concrete barrier and single steel pipe railing along bridge deck and wingwalls - Remove concrete overhang along bridge deck - Partial depth concrete removals (Type A) and repairs at top of bridge deck - Partial depth concrete removals (Type B) and repairs at deck soffit - Partial depth concrete removals (Type B) and repairs at concrete diaphragms - Remove expansion joint assemblies at abutments & Pier #3, including end sections of deck (full depth) and ballast walls at abutments - Install stiffeners for jacking at steel girders - Design and install temporary supports and jack bridge deck at abutments and Pier #3 - Partial depth concrete removals (Type C) and repairs at abutments (wingwalls & abutment walls) - Partial depth concrete removals (Type C) and repairs at pier caps and shafts - Partial depth concrete removals (Type B) and repairs at prestressed girder ends (abutments & Pier #3) - Clean structural steel and perform structural steel repairs at ends of steel girders (girders, diaphragms, bracings, stiffeners, etc.) - Apply protective coating to cleaned steel surfaces. - Remove and replace bearings and bearing assemblies at abutments (steel and concrete girders) - Remove and replace bearings and bearing assemblies Pier #3 (steel girder only) - Lower bridge deck and remove temporary supports - Reconstruct ballast walls, including seat for new approach slab - Install new expansion joints at abutments and Pier #3, including concrete blockouts - Reconstruct concrete deck overhangs, including new deck drains - Reconstruct upper section of concrete wingwalls - Construct new concrete parapet wall and steel pipe railing on bridge deck and wingwalls - Backfill wingwalls and ballast walls - Construct new approach slabs - Apply new hot-rubberized waterproofing membrane and protection board on bridge deck and approach slabs - Pave bridge deck and approaches - Install new steel beam guide rail at approaches, including structure connections and energy attenuating terminals - Restore site to existing conditions Remove construction enclosures and environmental / erosion & sediment control measures - Remove traffic detour and reopen bridge to public traffic - Demobilize Documents can be obtained at: https://prescott-russell.bidsandtenders.ca

Award

Bridges / Tunnels

$4,762,312.00

Public - County

Site Work

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
83
Bidding Soon
1,742
All Active Projects
752
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2022

March 10, 2023

img_map_placeholder

Multiple Locations, L'Orignal, ON

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.