Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 26, 2022 at 8:00 PM
Updated October 1, 2024
Site work, new construction and renovation of a mixed-use development in Novato, California. Completed plans call for the construction of a 9,000-square-foot laboratory facility; for site work for a laboratory facility; and 4,150-square-foot laboratory facility.
North Marin Water District (NMWD) Administration and Laboratory Upgrade Project In general, the Work consists of but is not limited to renovation of an existing 9,000sf administrative building, and new construction of a 4,150sf lab building, including new interior walls, doors, glazing, siding, ceilings, finishes, casework, lab equipment, and upgrades to HVAC, electrical, lighting, plumbing, telecommunications, and audio-visual systems. The project site is located at 999 Rush Creek Place, Novato, CA. The Contract time for Substantial Completion of all the Work is hereby established as 420 calendar days (14 months) beginning with the date of the Notice to Proceed from the District. The project site is located at 999 Rush Creek Place, Novato, CA. Bid guarantee, in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures, is required to be submitted with each bid as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fail to furnish in a timely manner, the bonds and/or proof of insurance. Pursuant to Section 1770, et seq., of the California Labor Code, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are available directly from the website maintained by the California Department of Industrial Relations The successful bidder will be required to furnish the following, within ten (10) working days after the date of the Notice of Award, Payment Bond in the amount equal to one hundred percent (100%) of the Contract price; Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price Completion- 420 calendar days (14 months)
Post-Bid
Laboratories
$12,866,000.00
Public - County
New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2022
June 20, 2022
999 Rush Creek Pl, Novato, CA
Related To This Project
Novato, CA
Bid Date: Apr 01 2021
Novato, CA
--
Novato, CA
Bid Date: Apr 28 2022
Novato, CA
Bid Date: May 03 2022
Novato, CA
Bid Date: Jun 15 2022
Novato, CA
Bid Date: Jun 02 2022
Novato, CA
Bid Date: May 12 2022
Novato, CA
Bid Date: May 19 2022
Novato, CA
Bid Date: May 12 2022
Novato, CA
--
Novato, CA
Bid Date: Feb 16 2023
Novato, CA
Bid Date: Feb 16 2023
Novato, CA
Bid Date: Nov 15 2022
Novato, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
North Marin Water District (NMWD) Administration and Laboratory Upgrade Project
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.