BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a mixed-use development in Novato, California. Completed plans call for the construction of a 9,000-square-foot laboratory facility; for site work for a laboratory facility; and 4,150-square-foot laboratory facility.

North Marin Water District (NMWD) Administration and Laboratory Upgrade Project In general, the Work consists of but is not limited to renovation of an existing 9,000sf administrative building, and new construction of a 4,150sf lab building, including new interior walls, doors, glazing, siding, ceilings, finishes, casework, lab equipment, and upgrades to HVAC, electrical, lighting, plumbing, telecommunications, and audio-visual systems. The project site is located at 999 Rush Creek Place, Novato, CA. The Contract time for Substantial Completion of all the Work is hereby established as 420 calendar days (14 months) beginning with the date of the Notice to Proceed from the District. The project site is located at 999 Rush Creek Place, Novato, CA. Bid guarantee, in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures, is required to be submitted with each bid as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fail to furnish in a timely manner, the bonds and/or proof of insurance. Pursuant to Section 1770, et seq., of the California Labor Code, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are available directly from the website maintained by the California Department of Industrial Relations The successful bidder will be required to furnish the following, within ten (10) working days after the date of the Notice of Award, Payment Bond in the amount equal to one hundred percent (100%) of the Contract price; Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price Completion- 420 calendar days (14 months)

Post-Bid

Laboratories

$12,866,000.00

Public - County

New Construction, Renovation, Site Work

175

28

21

6

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
42
Bidding Soon
1,709
All Active Projects
730
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2022

June 20, 2022

img_map_placeholder

999 Rush Creek Pl, Novato, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.