BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a pre-engineered storage facility in East Bernard, Texas. Completed plans call for the construction of a 5,000-square-foot, one-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Project No.S21124, 03122529 Request for Proposals will be presented at 9:30 a.m. on Monday, April 11, 2022 during the regular session of Commissioners' Court in the Courthouse Annex, 309 E. Milam, Suite 602, Wharton, Texas. Wharton County Commissioners' Court reserves the right to reject any and/or all bids and act in the best interest of the County. The Project consists of a pre-engineered metal building (PEMB), 50-foot by 100-foot with an approximate eave height of 22-feet to be constructed at 17423 Foundation Loop Drive in East Bernard, Texas for Precinct #2. The building will cover the recycling material and equipment to process recycled products. A non-structural concrete pad will be within the PEMB frame and shall be bid as an Add Alternate. Full metal sheathing of the sides shall also be bid as an Add Alternate. Primary electrical service to the building shall be provided by the Owner. Electrical gear and wiring for lighting and operating two (2) pieces of equipment shall be engineered by the electrical contractor and located as shown on the drawings. No site work is part of the project scope

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$186,767.00

Public - County

New Construction, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
76
Bidding Soon
2,732
All Active Projects
960
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2022

May 16, 2022

img_map_placeholder

17423 Foundation Loop, East Bernard, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.