BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 31, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Murray, Kentucky. Completed plans call for site work for a water / sewer project.

As of May 31, 2022, this project has not yet been awarded yet. A timeline for award has not yet been established. Unit price, sealed bids for the 2022 KY 121 Natural Gas Rehabilitation will include the installation of 2-330 linear feet of 6" steel pipeline by HDD, multiple 6" steel hot taps/stops, 2-6" steel valve installations, tie-ins, testing and pigging, directional bores, erosion control and other appurtenances as set out in plans and specifications, all at 3 separate locations in Calloway and Graves Counties. Bidder must agree also to pay as liquidated damages, the sum of five hundred dollars ($500.00) for each consecutive calendar day

Bid Results

Water / Sewer

$337,500.00

Public - City

Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
72
Bidding Soon
653
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2022

May 9, 2022

Project location map

Multiple Locations, Murray, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.