BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Greenfield, Missouri. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Waste Water System Improvement This project is being financed through the Missouri State Revolving Fund, established by the sale of Missouri Water Pollution Control bonds and federal Capitalization Grants to Missouri, and by a Community Development Block Grant (CDBG) administered by the Missouri Department of Economic Development. The work to be performed under the provisions of this contract consists of the complete construction as follows: Contract 1: Irrigation Improvements and Collection System Realignment: This section consists of increasing the existing lagoon irrigation capacities through the installation of two new wet wells with valve vault and irrigation pump equipment (one for each of the two lagoons), approximately 5,050 of 6 irrigation line and 5 new irrigation hook up stations (total, both lagoons). This section also includes the installation of approximately 1,220 linear feet of 12 gravity sewer line, two new manholes, and four existing manhole abandonments. Contract 2: Collection System Rehabilitation: This section consists of the rehabilitation of a portion of the existing City of Greenfield collection system using mainly trenchless sewer rehabilitation techniques as well as additional cleaning and televising of collection system sewer mains to identify and potentially perform additional collection system repairs as funds allow. More specifically, this contract includes installing cured-in-place pipe (CIPP) in approximately 8,700 linear feet of existing 8-inch diameter clay sewer main piping; various cured-in-place sectional point repairs, open-cut point repairs, and pressure testing and grouting of service laterals. The City of Greenfield, MO is an Equal Opportunity Employer and encourages the submission of bids from Women and Minority Business Enterprises, and Section 3-DBE bidders. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid security in the amount, form and subject to the conditions provided in the Information for Bidders.

Post-Bid

Water / Sewer

$1,600,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
16
Bidding Soon
341
All Active Projects
140
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2022

June 20, 2022

img_map_placeholder

Multiple Locations, Greenfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.