Site work and new construction of a municipal facility in Wylie, Texas. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

For GP&L Elm Grove Expansion Substation Construction Engineers Estimate: $1,300,000 This contract is for construction of the Garland Power & Light Elm Grove Switchyard Expansion. Civil site improvements have been completed at the site and generally consisted of clearing, grading, drainage, flexible base yard subgrade, and fence construction. Two (2) 138kV three phase transmission lines serve the switchyard. The westerly transmission line (Elm Grove-Ban Davis) will remain in place as currently configured. The easterly transmission line (Wylie-Elm Grove) will be modified by others including installation of a new transmission structure and conductors into the new A-Frame deadend being constructed with the switchyard expansion. Transmission line terminations by others will end at the line side of high voltage switches on the new A-Frame. Demolition within the existing Elm Grove Switchyard is part of this contract and generally includes removal of two overhead spans of transmission conductor and shield wire, removal of bus and bus supports, removal of potential transformers and partial demolition of their support foundations, removal of shield mast pole, and removal of one 138kV Gas Circuit Breaker; all as shown in the project plans and details. All materials and equipment removed shall be salvaged and delivered to the location specified by GP&L. Award must be made to the vendor submitting the most advantageous offer considering the relative importance of price and other evaluation factors. City reserves the right to request a best and final offer upon completion of negotiations. All questions must be answered within the Ion Wave Question & Answer segment. No emailed, faxed or phone call question related to this bid will be responded to. The deadline for submitting questions on this bid is March 29, 2022 at 5:00 p.m. This is an evaluated bid; please pay close attention to the GP&L Construction Contractors Questionnaire and Pricing Grading Sheet. Provide all information requested in an organized response. A Bid Bond in the amount of 5% is required with your bid submittal. A Payment, Performance and Maintenance Bond will be required upon notification of award. Please acknowledge the City of Garland Terms and Conditions in the Attributes section.

Bid Results

Municipal

$1,265,705.00

Public - City

New Construction, Site Work

219

21

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
86
Bidding Soon
3,647
All Active Projects
1,333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2022

May 31, 2022

img_map_placeholder

3180 Elm Grove Rd, Wylie, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.