Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 26, 2022 at 8:00 PM
Updated September 14, 2023
Site work and paving for a sidewalk / parking lot in Keller, Texas. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
As of May 26, 2022, project was awarded to Ci pavement, awarded amount is $285,527.55. Bid Results: CI Pavement $285,527.55 H Bonilla $298,761.54 Camcrete Contracting $300,600.30 The estimate for this project is $346,315.00 which includes a 10% contingency. The City of Keller, Texas (the City) is soliciting proposals for Chase Oaks Sidewalk Repairs. The successful Contractor shall agree to provide the City with the specific equipment and services as outlined in the Specifications. The contractor shall provide concrete repair and replacement services for approximately 150 repair locations as shown in the attached map on page 14 of this document. The contractor shall provide and furnish all the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required for the work. Repairs may include removal of existing sidewalk and replacement with new concrete per City standards as attached, removal and replacement of ADA ramps to City standards as attached including curb and gutter replacements as indicated by the City. A list containing location addresses will be provided upon award of the contract. Question Cutoff Date 4/3/2022 02:00:00 PM (CT)
Award
Sidewalks / Parking Lot
$285,528.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 6, 2022
June 13, 2022
Chase Oaks Dr, Keller, TX
Related To This Project
Keller, TX
Bid Date: Aug 18 2020
Keller, TX
Bid Date: Jun 03 2022
Keller, TX
--
Keller, TX
--
Keller, TX
--
Keller, TX
Bid Date: Jun 01 2022
Keller, TX
Bid Date: Jul 29 2022
Keller, TX
Bid Date: Jan 10 2023
Keller, TX
--
Keller, TX
Bid Date: Apr 26 2022
Keller, TX
--
Keller, TX
--
Keller, TX
Bid Date: Feb 16 2022
Keller, TX
Bid Date: Jan 09 2023
Keller, TX
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
