BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a road / highway in Richland Center, Wisconsin. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of 05/20/2022 The Parks Commission rejected all bids. Grading sections of the trail, resurfacing sections of the trail with screenings and installing a rock crossing.The work must be completed by November 15, 2022.No proposal shall be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to Richland County Parks Commission as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. Richland County reserves the right to waive any informality or to reject all bids.

Final Planning

Roads / Highways

$65,000.00

Public - County

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
75
Bidding Soon
767
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2022

November 21, 2022

Project location map

Pine River Trail, Richland Center, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.