BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Marion, Illinois. Completed plans call for the renovation of a educational facility.

Work to include the complete demolition of two existing HVAC roof top units and one HVAC make up air unit; support rails, roof flashings, roof mounted exterior ductwork, and interior transition ductwork. Work also to include the installation of two new HVAC roof top units, one new HVAC make up air unit; new support rails and roof flashings, new jacketed roof mounted exterior ductwork, new interior transitions ductwork; and connect to existing watt-master control system. There is a separate roofing project at this facility that is scheduled concurrently with this project and it shall be the responsibility of both contractors to coordinate their project and work schedules, including the work schedules of the subcontractors, with each other.

Award

Educational

$275,000.00

Public - City

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
70
Bidding Soon
967
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

June 2, 2022

Project location map

700 E Boulevard St, Marion, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.