BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 20, 2022 at 8:00 PM

Updated September 2, 2023

Site work for a water / sewer project in Deltona, Florida. Conceptual plans call for site work for a water / sewer project.

Work generally involves installation of two new wellheads (Wells No. 41 and 42) and appurtenances, installation of a new raw water pipeline, installation of potable water main replacements, replacement of an aerator on an existing ground storage tank (GST), replacement of piping within the GST and other miscellaneous improvements. Contract time is 180 days to substantial completion, with an additional 30 days to final completion. Total contract time for this project is 210 days. Engineers Estimate for this project is $1,670,000.

Project Abandoned

Water / Sewer

$1,670,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
127
Bidding Soon
1,944
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2022

July 11, 2022

Project location map

551 Courtland Blvd, Deltona, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.