BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Wilsonville, Oregon. Completed plans call for the renovation of a educational facility.

General Contractors will be required to submit a First-Tier Subcontractor Disclosure within the timeframe indicated below. 1.02 BIDDING DOCUMENTS A. Briefly, the work for this project shall be executed under a single general construction contract and includes Architectural and Fire Protection disciplines and work for the construction of Boeckman Creek PS Fire Sprinkler Replacement for the West Linn-Wilsonville School District. B. Bidding documents for the work are those prepared by the Architect, IBI Group Architects Inc.; 907 SW Harvey Milk Street; Portland, OR 97205 (503-226-6950). Bona fide General Bidders, may obtain two (2) hard copies free of charge, starting March 18, 2022, at Willamette Print and Blueprint; 3461 NW Yeon Ave., Portland, OR 97210; (503-223-5011). Plan holders will also have access to digital documents at Willamette Print and Blueprint at the same location. C. Should a bidder wish additional sets or parts of sets, the bidder may obtain them by paying the cost of the reproduction thereof, plus handling and mailing costs, with no refund for the additional sets or parts thereof. D. Bidders shall use complete sets of Bidding Documents in preparing Bids. Neither the School District nor the Architect assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents. 1.04 No bidder may withdraw his/her bid after the hour set for the opening thereof, or thereafter, before award of the Contract, unless award is delayed for a period exceeding thirty (30) days from the date of bid opening. Return or retention of bid security shall be subject to the provisions of ORS 279C.385. 1.05 DISCLOSURE FORM A. All contractors, pursuant to ORS 279C.370, are required to complete Document 00 43 50 First Tier Subcontractor Disclosure Form. The completed form must be received at the District Operation Center Offices within 2 hours of the Bid Time of the same day. B. All bids must be received at District Operations Center prior to bid closing date and time shown above. C. This Project is subject to State of Oregon Prevailing Wage requirements in accordance with ORS 279C.800 through ORS 279C.870 .

Award

Educational

$950,000.00

Public - County

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
28
Bidding Soon
576
All Active Projects
274
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2022

June 27, 2022

img_map_placeholder

6700 SW Wilsonville Rd, Wilsonville, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.