EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 21, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Elgin, Illinois. Completed plans call for the renovation of a educational facility.

PROJECT DESCRIPTION: The work includes but is not limited to: Toilet room renovations at Channing Elementary and Kimball Middle School as shown on the drawings and described herein. All demolition, architectural, mechanical, electrical, and plumbing work will be the responsibility of the general/prime contractor CONSTRUCTION BONDS REQUIRED: Upon award of contract, a Performance Bond and Material & Labor Payment Bond will be required from the General Contractor for 100% of the contract sum, payable to the Owner. PREVAILING WAGE LAW: This project is subject to the Illinois Prevailing Wage Act (820 ILCS 130). PREQUALIFICATION PROCEDURE - All interested bidders are required to complete an AIA document A305, Contractor's Qualification Statement, and submit it with all bidding documents at the time of bidding. Attendance at the meeting is limited to a maximum of two team members per bidding contractor due to social distancing requirements. All attendees will be required to wear a face mask and keep six feet social distancing at all times while on SD U-46 premises. BID GUARANTEE: Contractors shall guarantee their submitted Bid Proposal for a ninety (90) day period from the date of Bid Opening. Receipt of a Bid Bond of ten percent (10%) of the amount of the base bid(s), (including all alternates and allowances) or a Cashier's Check, made payable to School District U-46, is required prior to the time of the virtual bid opening. Contractor shall send the original Bid Bond or Cashier's Check to the Business Services Office (School District U-46 Business Services Office, 1474 Sheldon Drive in Elgin, Illinois 60120) via Certified mail, UPS, or FedEx to ensure confirmed delivery prior to the Bid Opening. If Contractor has an electronic certification process, then they will be able to upload the Bid Bond into the bidding portal. Bids will not be accepted without a Bid Bond / Cashier's Check at Bid Opening. All vendors who attend the mandatory pre-bid meeting will receive an invite to the public bid opening conducted by the Business Services Department. Upon completion of the pre-bid meeting, the person that was in attendance will receive the invite via email to a zoom meeting on the project's established bid opening date and time. At that time, the bid will be unsealed and all bid totals will be read aloud and will be able to be visually viewed on the screen. We will send out a public notice to all bidders with the copy of the tall sheet shortly thereafter. For more information contact Mark Villaros, 847-888-5000, ext. 5720 Toilet room renovations at Channing Elementary and Kimball Middle School as shown on the drawings and described herein. All demolition, architectural, mechanical, electrical, and plumbing work will be the responsibility of the general/prime contractor. 1 All costs for overtime, weekend work, or additional manpower shall be included in the Base Bid, as required to meet the project schedule/timeline as outlined herein. 2 All work shall be under General Contractor. All demolition, architectural, structural, food service, civil, mechanical, electrical, plumbing, and fire protection work is a part of the General Contractor's responsibility. 3 The Contractor shall field verify all existing electrical and mechanical piping and conduit runs and all other associated MEP & FP items, such as fire alarm, H.V.A.C. controls, security systems wiring, etc. not only within and adjacent to the project area, but also any electrical runs, controls, gas lines, sprinklers, etc. that feed other areas within the building. The field verification shall be conducted prior to the start of this project and coordinated with the schools' daily schedule, which may include, but is not limited to, evening and weekend hours. (See Article 6.9) 4 The "Time Schedule" for this work is very critical. When submitting a bid the General Contractor agrees he can meet the completion requirements. The bidder agrees he has adequate staff and financial resources to complete the project on time. He further agrees he has included any premium necessary to have workers on overtime, multiple working shifts, holidays, weekends or any other arrangement to adequately man the project to meet the schedule. The Contractor further agrees he will place a Project Superintendent from his staff full time on the project. In addition, the Project Superintendent must be on site any time any subcontractors are on site. Failure to maintain a full time Project Superintendent on the site from start to final acceptance will be reason for the Owner to deduct from the contract amount all costs of services if the Owner and/or Architect decide any other services are required to complete the project in an orderly and timely manner. 5 There are Liquidated Damages Provisions for the Substantial Completion of this project, due to the critical time schedule. (See Article 17) 6 The School District may elect to interview the Contractor after bids are received as part of the award process. 7 The Contractor is notified that Allowances are included in this project. See Specification 8 The General Contractor must include in his bid full-time on site supervision, as well as all overtime necessary for the Project Superintendent to be present onsite any time there is any work occurring on the project. 9 The Contractor agrees by submitting a bid that he has included adequate safety precautions and protection to insure safe conditions for the building occupants during the entire project. The Contractor shall cooperate with the Owner at all times and coordinate construction work to maintain the safety, health, and welfare of students, staff, workers and other contractors. The General Contractor alone is responsible for safety on this project. 10 The expectation is that each trade contractor shall order all necessary project materials upon submittal(s) approval. Trade contractor is responsible for any/all cost incurred including but not limited storge fees, delivery fees, various material handling costs, etc. Contractor to include these costs in base bid. Reference the schedule for milestones. 11 Contractor shall protect the work area from all garbage/debris and clean up site at the end of the shift so that area is clean and ready for staff/students in the morning. Contractor shall cooperate with the Owner at all times and coordinate construction work to maintain the safety, health, and welfare of students, staff, workers, and other contractors. 12 Contractor responsible to apply and obtain a building permit from the City of Elgin prior to start of construction. All City of Elgin Fees to be included in the base bid. 13 All Shop Drawings to be submitted four weeks after the bid opening by the Apparent Low Bidder: 14 There will be other summer construction projects occurring at the school. Superintendent responsible to coordinate all access and construction staging areas with all the other construction projects. 15 Final construction cleaning is the responsibility of the prime/general contractor. To be completed by Substantial Completion.

Award

Educational

$602,288.00

Public - County

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Curtain Wall and Glazed Assemblies, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Commercial Toilet Accessories, Safety Specialties, Fire Protection Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
193
Bidding Soon
2,619
All Active Projects
1,282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2022

June 6, 2022

img_map_placeholder

Multiple Locations, Elgin, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Toilet Room Renovations at Multiple Schools

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.