EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 23, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Shreveport, Louisiana. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of May 23, 2022, there were no bids received. No definite date for the rebid. **As of May 9, 2022, there were no bids received. No definite date for the rebid.** The work specified in this section consists of furnishing and installing an underground potable water pipeline using the horizontal directional drilling (HDD) method of installation, also commonly referred to as directional boring or guided horizontal boring. This work shall include all services, equipment, materials, and labor for the complete and proper installation, testing, restoration of underground utilities and environmental protection and restoration. This specification is primarily written for the installation of high density polyethylene (HDPE) pipelines. Designer's Estimate $3,292,000 Bid security percent:5% Q & A deadline: Apr 26, 2022 3:00:00 PM EDT Directional drilling and pipe installation shall be done by an experienced Contractor specializing in directional drilling and whose key personnel have at least five (5) years experience in this work. Furthermore, the Contractor must have installed directionally drilled pipe at least as large as 30 inches in diameter, having performed installations of at least 2,000 feet in length, and successfully installed at least 50,000 feet in total length. Number of Days: 360 Calendar Days

Final Planning

Roads / Highways

$3,292,000.00

Public - City

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
19
Bidding Soon
302
All Active Projects
126
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2022

November 23, 2022

img_map_placeholder

Knight St, Shreveport, LA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.