Demolition, site work, paving and new construction of a bridge / tunnel in Norwood, Massachusetts. Design plans call for the construction of a bridge / tunnel; for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The work for the bridge carrying US Route 1 over the Neponset River shall consist of reconstructing the bridge and approach wearing surface; removing and replacing the reinforced concrete deck slab; upgrading the bridge rails; checking the existing beams cover plates for fatigue and providing modifications as needed; repairing the existing substructure; and fully cleaning and painting the structural steel. The expected structural work shall consist of, but not be limited to the following: o The existing concrete deck shall be replaced with the department's 4000psi HP deck concrete composite with the existing beams. The consultant may consider using an 8 3/4 inch exposed concrete deck, or an 8 inch concrete deck with 3 1/2 inch Bituminous wearing surface. The consultant shall produce a rating for whichever option is used. Either option shall maintain a slope similar to the existing roadway slope. The existing shear connectors shall be replaced with new shear connectors designed per latest AASHTO standards. o The end of bridge joint shall be replaced with the slab-over detail as in the Bridge Manual. o The approach roadways and median barriers shall be replaced as needed within the limits of work, as required for the completion of the deck replacement. o The new sidewalk, according to Bridge Manual design, will require 5.5 feet of side walk width along the Southbound roadway. o A new safety curb along the Northbound roadway shall be installed according to Bridge Manual design. o New S3-TL4 bridge barrier shall be used, and new highway guard rail transitions shall be located on all four corners of the bridge. o The existing Beam Cover Plates shall be checked for fatigue and provided with modifications as needed, and structural steel shall be fully cleaned and painted. (Environmental concerns may be warranted due to the proximity to the Neponset River) o The existing Abutments and Wingwalls shall be repaired as needed. Over the next five years. MassDOT expects to invest over $3 billion repairing the Commonwealth’s Bridges. This includes $816 million already programmed in the STIP using BIL’s reauthorization of existing programs, $1.1 billion under BIL’s new Bridge Formula Program, and $1.25 billion in bonding authority under the Commonwealth’s Next Generation Bridge Program. As of March 25, 2022, further details regarding design and firm construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Design
Bridges / Tunnels
$3,010,892.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2026
Providence Hwy, Norwood, MA
Related To This Project
Norwood, MA
Bid Date: Jan 23 2024
Norwood, MA
Bid Date: Dec 21 2023
Norwood, MA
--
Norwood, MA
Bid Date: Feb 15 2024
Norwood, MA
Bid Date: Feb 22 2024
Norwood, MA
Bid Date: Feb 29 2024
Norwood, MA
Bid Date: May 23 2024
Norwood, MA
Bid Date: May 23 2024
Norwood, MA
Bid Date: Oct 10 2018
Norwood, MA
Bid Date: Oct 22 2018
Norwood, MA
Bid Date: Dec 10 2018
Norwood, MA
Bid Date: Dec 10 2018
Norwood, MA
Bid Date: Jan 31 2022
Norwood, MA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.