Published June 8, 2022 at 8:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to a parking garage in Alliance, Ohio. Completed plans call for the addition of a parking garage; for the demolition of a parking garage; for the renovation of a parking garage; and for site work for a parking garage.

Any questions pertaining to interpretation of Contract Documents are to be submitted in writing to the Architect: SoL Harris/Day Architecture Attn: Todd Rainsberg 6677 Frank Ave. NW North Canton, OH 44720 Phone: 330-493-3722 trainsberg@solharrisday.com Each bid shall be in conformity with the Ohio Revised Code and all bids and certificates shall be upon the forms furnished with the specifications and shall be delivered to the Alliance City School District Board of Education, 200 Glamorgan Street, Alliance, Ohio 44601at or prior to the date and hour specified for receiving bids. The Owner is not responsible if documents are received too late for timely bid. In the case of corporations not chartered in Ohio, the bid shall be accompanied by a proper certificate of the Secretary of State, certifying that such corporation is authorized to do business in Ohio. Each bid shall be accompanied by a bid guaranty in the form of: (1) a certified check, or cashier's check, or letter of credit, equal to 10% of the bid; or (2) a bid and performance guaranty bond for the full amount of the bid; both forms of guaranty as provided in Chapter 153 of the Ohio Revised Code. The amount of the bid for said guaranty purposes shall include all additive alternates if appropriate. All bid guaranties shall be on condition that if the bid is accepted within sixty (60) days of the bid opening, a proper Contract shall be executed, and that upon failure or refusal to enter into said contract within ten (10) days after receipt of notification of award the bidder and the surety on any bond shall be liable to the Alliance City School District Board of Education in an amount not to exceed ten (10%) percent of the bid. No Bidder may withdraw his Proposal for a period of sixty (60) calendar days after the date and time of receipt of bids, except as provided by State law. The Alliance City School District Board of Education reserves the right to reject any or all bids, to waive any informalities or irregularities in the bids received, and to accept any bid or combination of bids which is deemed most favorable to the Alliance City School District Board of Education at the time and under the conditions stipulated. The Alliance City School District Board of Education further declare that they will award the contracts for this project to the lowest responsive bidder, which may not necessarily be the lowest bidder. The Specifications contain AIA Document A305, Contractor's Qualification Statement designed to gather certain information that may be considered in this regard. No single factor will control the Owner's decision to award, and the Owner reserves the right to exercise its full discretion.

Award

Parking Garage

$200,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Plastic Doors, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Casework
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Central Heating Equipment, Fuel-Fired Heaters, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
139
Bidding Soon
1,430
All Active Projects
687
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 2, 2022

img_map_placeholder

326 Walker Ave, Alliance, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Additions and Renovations to Existing Bus Garage for Alliance City School District

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.