BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Fruita, Colorado. Completed plans call for site work for a water / sewer project.

The City of Fruita, Colorado owns and operates an advanced wastewater reclamation facility (WWRF), which is located at 1131 15 Road, Fruita, Colorado 81521. Tetra Tech (Engineer) prepared an updated Needs Assessment Study (NAS) for the Fruita WWRF in 2021. The NAS included a prioritized list of improvement projects for implementation through the Year 2027. During 2022, the City intends to (1) install process upgrades for sludge granulation and (2) install H2S gas ventilation and odor control at the WWRF including replacement of manholes on the gravity interceptor line. When the sludge granulation project is complete, the WWRF anticipates year-round sludge settling improvement, lower RAS rate operation, thicker initial feed solids to RDT conditioning tank, higher capacity of single ditch operation, lower operating solids retention time, and potential for reducing filamentous bacteria interruptions and improved biological nutrient removal performance. When the H2S project is complete, the city anticipates the reduction of hazardous environments and reduction in risk of blockages from deteriorating infrastructure in the collection system. The city is seeking a construction manager at risk (CMAR) to help it implement the sludge granulation project and H2S ventilation/odor control and manhole replacements in 2022. Depending upon the success of the 2022 Project, the City may request that the CMAR provide guaranteed maximum pricing (GMP) for improvements currently slated for 2023 and subsequent years. The City of Fruita intends to select a CMAR based on qualifications and negotiate a GMP for the work package(s). The selected CMAR will work with the staff at Fruita WWRF and Tetra Tech (Engineer) to provide constructability, construction sequencing, and cost savings input before the design work packages are finalized. GMP pricing will be by means of an open book method and a shared savings provision will be included in the agreement with the CMAR. The City of Fruita or Engineer reserves the right to require the submission of additional information.

Post-Bid

Water / Sewer

$1,287,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
17
Bidding Soon
123
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.