Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and renovation of a civil project in Novato, California. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
Project Number- 8827B Demolition and construciton of MVMVV Sewer Pump Station #1 and force main. Work includes removal/retrofit of existing pump station, including generator, pumps and force main.Project Duration:120 Work Days Engineer's Estimated Cost: $1,480,000 to $1,480,000 Project Contact: Elisa Sarlatte City of Novato 922 Machin Avenue Novato, CA 94945 Tel:(415) 899-8963 Fax:(415) 899-8251 esarlatte@novato.org *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work to be done includes, but is not limited to: rehabilitation of Marin Valley Mobile Country Club (MVMCC) Pump Station No. 1 including required demolition of the existing pump station, demolition and removal of the existing generator and controls, and including construction of a new 6" HDPE force main, modifications to the existing subsurface concrete structure, construction of a valve pit, rehabilitation of the influent manhole, replacement of the influent sewer, installation of a new pump control panel and all electrical work, installation of a 40 kW engine generator, all surface improvements, site improvements, fencing, landscaping, drainage improvements, pavement restoration, temporary controls, bypass pumping, erosion control, and all other work as shown on the Plans and as called for in the Special Provisions and as directed by the Engineer.
Award
Water / Sewer
$1,293,630.00
Public - City
Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2022
June 27, 2022
116 Marin Valley Dr, Novato, CA
Related To This Project
Novato, CA
Bid Date: May 03 2022
Novato, CA
Bid Date: Jun 15 2022
Novato, CA
Bid Date: Jun 02 2022
Novato, CA
Bid Date: May 12 2022
Novato, CA
--
Novato, CA
--
Novato, CA
--
Novato, CA
Bid Date: Apr 01 2021
Novato, CA
Bid Date: Apr 21 2022
Novato, CA
Bid Date: May 19 2022
Novato, CA
Bid Date: May 12 2022
Novato, CA
--
Novato, CA
Bid Date: Feb 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.