Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Hamilton, Ontario. Completed plans call for site work for a water / sewer project.
Bidders eligible to submit for this Request for Tenders have been previously selected through the process of Request for Prequalifications, issued under C14-11-23 which closed on January 26, 2024. The scope of work for Dundas Wastewater Treatment Plant (WWTP) includes but is not limited to the following: 1. Repair concrete spalls, scaling and cracks on boardwalks and slabs throughout the plant; 2. Repair steel beam fireproofing in the basement of control building for Plant B; 3. Apply epoxy coating to the concrete within the ferric chemical containment area; 4. Replace the existing steel guardrail within the digester building, control buildings, and throughout Plant A with a new fiberglass reinforced plastic (FRP) guardrails that meets the current OBC requirements; 5. Install a new FRP guardrail around the plant inlet chamber; 6. Upgrade the existing aluminum railing throughout the plant to ensure it meets the OBC requirements including base plate modifications and kick plate installation; 7. Replace the four existing wooden baffles within the primary clarifier of Plant B with equivalent FRP baffles; 8. Replace the eight existing wooden baffles within the secondary clarifier of Plant B with equivalent FRP baffles; 9. Replace the entire existing wooden baffle within the grit building with an equivalent FRP baffle; 10.Replace the existing wooden baffle within the chlorine contact tank of Plant A with an equivalent FRP baffle; 11.Replace the existing handwheel actuated scum collection system within the primary clarifier of Plant B with a new lever actuated scum collection system; 12.Replace the existing return sludge piping above the aeration tanks in Plant B including the pipe hangers and two manually operated valves; 13.Replace the two exiting access hatches above the basement of the Plant B control building with new access hatches that require a key/tool for external entry; 14.Install new railing mounted hatch locking system above six access hatches for buried chambers throughout the plant as identified in the contract documents; 15.Install steel clips to secure walkway grating throughout the plant; 16.Review completed DSS report and provide and implement a designated substance removal/ safe work plan 17.Remove the asbestos cladding on the outside of the digester valve building. 18.Replace the existing diffusers and associated piping in the Aeration Tanks of both Plant A and B including pipe/diffuser supports and isolation valves; 19.Provide temporary bypass pumping to support concrete repairs; 20.Provide temporary RAS piping to support aeration tank isolations; 21.Replace screening building inlet gate; 22.Replace sluice gate isolation valve between cell 1 and cell 2 of Plant A Aeration tanks; 23.Replace Plant A inlet channel slide plate; 24.Replace Plant B inlet channel slide plate; 25.Install aluminum stairs from the driveway to the west side of the Ferric building, inside the Ferric Building and within the Plant B control building; and 26.Replace the aluminum staircases in the basement of Plant B Control building. Documents can be obtained at: https://hamilton.bidsandtenders.ca Question Deadline: Tue Jan 21, 2025 11:59:00 PM (EST) Generally, the Work under this Contract includes, but is not limited to, the following: .1 Repair concrete spalls, scaling and cracks on boardwalks and slabs throughout the plant. Repair steel beam fireproofing in the basement of control building for Plant B. Apply epoxy coating to the concrete within the ferric chemical containment area. Replace the existing steel guardrail within the digester building, control buildings, and throughout Plant A with a new fiberglass reinforced plastic (FRP) or aluminum guardrails that meets the current OBC requirements. Install a new FRP guardrail around the plant inlet chamber. Upgrade the existing aluminum railing throughout the plant to ensure it meets the OBC requirements including base plate modifications and kick plate installation. .7 .8 .9 CITY OF HAMILTON C13-32-24 DUNDAS WASTEWATER TREATMENT PLANT (WWTP) HEALTH AND SAFETY IMMEDIATE NEEDS AND STRUCTURAL REPAIR UPGRADES 01100 SUMMARY OF WORK Page 2 of 7 Replace the four existing wooden baffles within the primary clarifier of Plant B with equivalent FRP baffles. Replace the eight existing wooden baffles within the secondary clarifier of Plant B with equivalent FRP baffles. Replace the entire existing wooden baffle within the grit building with an equivalent FRP baffle. . 10 Replace the existing wooden baffle within the chlorine contact tank of Plant A with an equivalent FRP baffle. .11 Replace the existing handwheel actuated scum collection system within the primary clarifier of Plant B with a new lever actuated scum collection system. .12 Replace the existing return sludge piping above the aeration tanks in Plant B including the pipe hangers and two manually operated valves. . 13 Replace the two exiting access hatches above the basement of the Plant B control building with new access hatches that require a key/tool for external entry. .14 Install new railing mounted hatch locking system above six access hatches for buried chambers throughout the plant as identified in the X contract documents. .15 Install steel clips to secure walkway grating throughout the plant. .16 Review completed DSS report and provide and implement a designated substance removal/ safe work plan. .17 Replace the existing diffusers and associated piping in the Aeration Tanks of both Plant A and B including pipe/diffuser supports and isolation valves. .18 Provide temporary bypass pumping to support concrete repairs. .19 Provide temporary RAS piping to support aeration tank isolations. .20 Replace screening building inlet gate. .21 Replace sluice gate isolation valve between cell 1 and cell 2 of Plant A Aeration tanks .22 Replace Plant A inlet channel slide plate. .23 Replace Plant B inlet channel slide plate. .24 Install aluminum stairs, inside the Ferric Building and within the Plant B control building .25 Install aluminum stairs from the driveway to the west side of the Ferric building. .26 Replace light fixtures within the Digester Valve building .27 Removal, safe disposal and replacement of existing expansion joint per the inlet channel west of the Plant B Primary Clarifier building (Provisional Item 4.1). .28 Draining & cleaning of each isolated cell prior to the existing condition inspection including any sludge removal and disposal. .29 Additional Vacuum Truck Services including haulage and disposal. As directed by the Engineer. Over and above what is specified within these specifications (Provisional Item 4.2).
GC Bidding
Water / Sewer
$5,000,000.00
Public - City
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 24, 2025
March 24, 2025
135 King St E, Hamilton, ON
Related To This Project
Hamilton, ON
Bid Date: Mar 17 2023
Hamilton, ON
Bid Date: Jul 19 2022
Hamilton, ON
--
Hamilton, ON
--
Hamilton, ON
Bid Date: Jul 29 2022
Hamilton, ON
Bid Date: Aug 29 2022
Hamilton, ON
Bid Date: Aug 29 2022
Hamilton, ON
Bid Date: Jul 12 2022
Hamilton, ON
Bid Date: Jun 01 2022
Hamilton, ON
Bid Date: Jul 21 2022
Hamilton, ON
Bid Date: Jul 26 2022
Hamilton, ON
Bid Date: Jun 21 2022
Hamilton, ON
Bid Date: Jul 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.