BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in New Milford, Connecticut. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Engineering Services for Brookside Avenue Bridge Replacement The Town of New Milford is requesting proposals from qualified professional firms licensed in the State of Connecticut to provide engineering design and optional construction services for the Town. The goal of Phase I of the engineering design project is to produce a complete set of design plans, specifications and bid documents for the bridge replacement project. Work shall include all studies, investigations, reports, cost estimates, documents, designs, plans, specifications, meetings and other tasks necessary to complete the overall design and secure all local, State and Federal approvals. Work under Phase I will conclude upon the completion of the Bidding Phase. The consultant selected for Phase I may also be chosen to provide Phase II construction services. Phase II is comprised of construction administration, inspection services and support. In addition to meeting the State Local Bridge Program guidelines, the new structure shall also: o Provide a service life of 50 years minimum o Have minimal maintenance requirements o Be economical to construct and maintain o Be aesthetically compatible with the surrounding environment The consultant shall thoroughly investigate the site, review State Bridge Inspection Reports and make recommendations to the Town of New Milford for the most economical design that satisfies the objectives established previously herein. The latest State of Connecticut Bridge Inspection Report for this structure may be obtained directly from the Connecticut Department of Transportation The Town reserves the right to reject any and all submissions. The method of Contractor Selection has not been Determined at this time

Conceptual

Bridges / Tunnels

$600,000.00

Public - City

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
174
Bidding Soon
4,216
All Active Projects
1,803
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2023

img_map_placeholder

Brookside Ave, New Milford, CT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.