BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Site work and paving for a civil project in Bowmanville, Ontario. Design plans call for paving for a road / highway; and for site work for a water / sewer project.

Rehabilitation of Liberty Street (RR14) from Baseline Road to King Street. The modifications will be on Liberty Street from approximately 200 metres south of Baseline Road to 100 metres north of King Street East; along Baseline Road from 200 metres west of Liberty Street to 350 metres east of Liberty Street; and along King Street East from 150 metres west of Liberty Street South to 150 metres east of Liberty Street. The road pavement for Liberty Street and Baseline Road will be fully reconstructed within the project limits. The proposed transportation improvements include two-way left-turn lanes, a new multi-use path on Liberty Street, new bus pads, and intersection modifications. Intersection modifications at the Liberty Street and Baseline Road intersections will include new traffic signals, new northbound and westbound right-turn lanes and modifications to the taper and storage lengths of the existing turning lanes. The intersection modifications at the Liberty Street/King Street intersection will include changes to the storage and taper lengths of the right-turn and left-turn lanes to increase the intersection capacity. As a result of the road widening and future MUP, the storm sewer will have to be replaced and sized to accommodate the additional stormwater runoff. The existing watermain and sanitary sewer on Liberty Street is reaching the end of its lifecycle and will be replaced as a part of this project. Within this project, the existing watermain on Baseline Road from Hunt Street to Soper Creek / Simpson Avenue South will also be replaced. TIMELINE: Design is ongoing. Utility relocations are required. Construction is not anticipated prior to 2027. Updates may be available late spring 2026.

Design

Roads / Highways

$6,300,000.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
431
Active Projects
216
Bidding Soon
4,368
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2027

Project location map

Liberty St N, Bowmanville, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.