BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2024 at 8:00 PM

Updated June 8, 2024

Site work, paving, outdoor lighting and renovation of a mixed-use development in Dallas, Texas. Completed plans call for the renovation of a 77,000-square-foot educational facility; office development; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a educational facility.

As of May 30th, 2024 this project is set to begin construction work on June 10th, 2024. Scope of Work. The Work consists of: ORG # 201 - Charles Rice Learning Center - Project consists of the following: 1. Provide security updates including cameras, card access readers and door contacts. 2. Provide secure front vestibule. 3. Renovate and expand administration. 4. Replace exterior waterproofing/sealant joints. 5. Add ramp to access public right of way from main entry. 6. Replace fire alarm system. 7. Provide exterior lighting controls. 8. Replace exterior lights with LED lighting. 9. Provide/replace IDF/MDF air conditioning. 10. Replace educational casework in all classrooms. 11. Remove and replace ceiling with new acoustical lay-in ceiling tile and grid throughout facility (except at areas of renovation). 12. Replace carpet/vinyl composite tile (VCT) and base throughout facility excluding all main corridors, auditorium and athletic areas (include ACM abatement where applicable and except at areas of renovation). 13. Replace teaching surfaces at each classroom. 14. Paint all previously painted interior surfaces. Repair/patch walls prior to painting (except at areas of renovation). 15. Provide new marquee. 16. Replace existing wood gym floor (include re-striping). 17. Paint all previously painted exterior surfaces and power wash as required. Provide new landscaping and sidewalk replacement as required. Construct new front entry canopy. 18. Replace modified bitumen roof system. 19. Perform mild detergent medium pressure wash on stained or mildewed facade. 20. Provide interior lighting controls. 21. Replace interior lights with LED lighting. 22. Mechanical/HVAC improvement including new split system and rooftop units, replace condenser water piping, controls, condenser water pumps, and air cooled chiller. 23. Plumbing improvements include replacing gas piping, waste piping and hot water heater. 24. Provide new flexible 'next gen' furniture. Technical questions and all other questions related to this solicitation are to be referred to: Attention: Dallas ISD Procurement Services Email: ProcurementCS@dallasisd.org Question Deadline 11/01/2023 End of Business

Post-Bid

Educational

$6,677,578.00

Public - City

Outdoor Lighting, Paving, Renovation, Site Work

179

30

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
161
Bidding Soon
4,035
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

June 10, 2024

Project location map

2425 Pine St, Dallas, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.