BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bottineau, North Dakota. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

Tommy Turtle Park Stair Shelter/Sidewalks/Patio 2022 Project The approximate quantities of work and material for construction of the project are as follows: Remove & dispose of current 30' x 40' concrete slab within the Stair shelter Remove & Salvage minimum 6" topsoil in new concrete locations (Topsoil to be retained by owner) Provide & install 4" Compacted Aggregate Base Course, Class 5 in all concrete location. Labor & All Materials for Sidewalk, Patio & Shelter Concrete per drawing - 4IN minimum thickness Stair Shelter 1200 SF unstamped (broomed) 8' x 220' sidewalk 1825 SF unstamped (broomed 5' x 15' playground sidewalk 75 SF unstamped (broomed) Patio & Stair entrance sidewalk 1450 SF stamped All Surfaces and Sloping to meet all ADA Requirements. All concrete to have 1/2 " rebar chaired & spaced at 2' apart (short bars in sidewalk will be 3' spacing) Rebar installed just below center of concrete. All concrete will be 4,000 psi. Contractor will perform control cuts in Shelter slab & Patio no more than 10' apart both ways and tool cuts on sidewalks no more than 6' spacing. Install 5' Detectable Warning Panel at Vinge Street connection (provided by owner). Contractor will provide Butterfield Concrete Products: Color U37 & 300 Antiquing release R12 and provide & perform Mayan Cobblestone stamping available at Prairie Supply Inc. (Minot) Contractor will provide and apply Clear Guard Cure & Seal along with a non-slip additive when sealing per manufactures recommendations. (Butterfield Products) . Contractor to provide all Incidental Items Contractor to keep all equipment within designated concrete areas to restrict earth compaction to surrounding landscape. Owner will apply sealer to all unstamped concrete. Owner to perform backfill along cement, along with fencing off area prior to construction. The work on the said project shall be started on or immediately following August 8, 2022 and be completed by September 30, 2022. The Bottineau Park Board reserves the right to reject all bids, and to waive any informality in any bid, and to hold the bids for a period not to exceed thirty (30) days from the date of opening bids.

Post-Bid

Playgrounds / Parks / Athletic Fields

$342,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
65
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2022

August 8, 2022

img_map_placeholder

801-899 8th St E, Bottineau, ND

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.