BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Seattle, Washington. Completed plans call for site work for a playground / park / athletic field; for the construction of a 10,612-square-foot, two-story above grade playground / park / athletic field; and for paving for a sidewalk / parking lot.

Hoffman Construction Company of Washington has been selected as the Design-Builder Seattle Overlook Walk (being performed for The City of Seattle. The Overlook Walk will create an elevated public park and connection between the waterfront to Seattle's urban core. People can walk on the elevated pathway from Pike Place Market to the waterfront without ever crossing the new Alaskan Way. Overlook Walk will have expansive views of Elliott Bay, informal play areas, new public plazas and landscaping. Overlook Walk was designed around several key features, including the Salish Steps, the Bay Overlook, a café and retail space and a play area for families on the Bluff Walk. These features weave in the natural and cultural meanings of the space, including featuring indigenous artwork and using native plants. Overlook Walk is at the center of improvements from Pier 62 up to Pike Place Market and east along to Seattle's urban core, including Pike and Pine streets. Overlook Walk will also be integrated with Seattle Aquarium's proposed Ocean Pavilion expansion. - Public access to the waterfront with gradual slopes and a new elevator - An elevated panorama of Elliott Bay, the Olympics & Mount Rainier - Protected areas with food and beverage and seating - Slides and other play elements for families - Terraced landscaping with native plants The park structure will include a 355 square foot mechanical room, 5,437 square foot warehouse/storage, 3,315 square foot screened area, on the first floor. The second floor with have a 1,326 square foot cafe lease space / assembly area, 126 square foot restroom, 54 square foot mechanical room, and a 3,050 square foot canopy. Bid Item #1A - Soldier Pile and Lagging Wall Budget: $550,000 Bid Item #1B - Earthwork, Utilities and Demolition Budget: $1,975,000 Bid Item #1C - Mechanical, Plumbing, Fire System and Drainage Budget: $2,800,000 Budget Item #1D - Electrical Budget: $2,500,000 This project is subject to Prevailing Wage Rates.

Post-Bid

Playgrounds / Parks / Athletic Fields

$15,650,000.00

Public - City

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
37
Bidding Soon
1,025
All Active Projects
335
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.