Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Toronto, Ontario. Design plans call for the construction of a 72,000-square-foot, four-story above grade clubhouse / community center; and for site work for a clubhouse / community center.
Development near Varna Drive and Ranee Avenue for construction for a Net Zero Emissions Building (NZEB) hub facility which includes a new Lawrence Heights Community Recreation Centre (LH CRC). Proposed features include: A six-lane, 25-metre lane pool; A leisure/tot pool; A double gymnasium with raised walking track; Universal change rooms and washrooms; Fitness/dance/aerobic studios; multi-purpose rooms; A community kitchen; A large lobby; Administrative space; An active roof; An outdoor playground with splash pad; Indigenous place-keeping elements; and WIFI access throughout the building. In addition, the development is set to house a new childcare centre offering 88 spaces, including 10 for infants, 30 for toddlers, and 48 for preschool children. It would feature dedicated playrooms, a kitchen, a laundry room, a toy washing station, a parent/staff resource room, and universal washrooms The facility will also include: Parent/staff resource room; Laundry room/toy washing station; Kitchen; Universal washrooms; Stroller storage space; Gross motor spaces; Lobby area; Infant playroom/sleep room; Toddler playrooms; Preschool playrooms; and Administrative and technical space. TIMELINE: Federal and city of Toronto funding has been allocated for the project. Program Review is being undertaken by the architect with the owner. Community Engagement will proceed through spring/summer 2024. The detailed design phase commenced in Spring, 2024 and is expected to last until Spring, 2025, with construction anticipated to begin in 2026 and be complete by 2028. Zoning approvals have been secured from the city of Toronto. Site plan approvals are required before the project can proceed, timing for the Site Plan Approval process are undetermined. Tender is expected early 2025 for construction start late 2025/early 2026.
Design
Clubhouse / Community Centers
$48,000,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
August 5, 2024
August 3, 2026
5 Leila Ln, Toronto, ON
Related To This Project
Toronto, ON
--
Toronto, ON
Bid Date: Aug 04 2022
Toronto, ON
Bid Date: Aug 04 2022
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Aug 04 2022
Toronto, ON
--
Toronto, ON
Bid Date: Aug 02 2022
Toronto, ON
Bid Date: Aug 02 2022
Toronto, ON
Bid Date: Aug 03 2022
Toronto, ON
--
Toronto, ON
Bid Date: Aug 03 2022
Toronto, ON
Bid Date: Nov 18 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--