BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a transportation facility in Milledgeville, Georgia. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

The Engineer/Architect for the project is Holt Consulting Company, LLC. The approximate extent and character of the work is generally described as follows: Runway 10-28 Rehabilitation and Associated Work: The project is generally described as the rehabilitation of Runway 10-28 by means of pavement milling and asphalt overlay, generally 2-inches in depth. The runway is currently 5,509 feet in length and approximately 100 feet wide. The project will also involve relocation of the Runway-28 threshold by a distance of 85 feet. This relocation will also necessitate the relocation of the runway threshold lights, re-spacing of the runway edge lighting, and the Runway 28 PAPI system. The final element contained in this project is the replacement of approximately 180 linear feet of fencing on the east end of the airfield that was recently modified to comply with the height requirements in the Modification of Standards (MOS). The OWNER of the project is the Baldwin County.

Award

Transportation Terminals

$1,777,747.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
131
Bidding Soon
1,839
All Active Projects
839
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 22, 2022

May 23, 2022

July 27, 2022

img_map_placeholder

216 Airport Rd NE, Milledgeville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.